The Application of Tunnel Monitoring and Measurement in Yanjia Tunnel of Guzhu Expressway

Abstract:

Article Preview

Fault fracture zone with rich water has some bad geological conditions such as low strength, deformation, strong water permeability, poor water resistance. This paper is based on Yan-jia Tunnel in HuBei-Guzhu Highway. WSS is taken as the advanced support method and has improved the construction condition. the construction method of meshshotcreting firstly is adopted. The result of numerical simulation with ABAQUS is basically consistent with the field measurements, which has significance on the subsequent design and construction of underground projects with similar geological conditions.

Info:

Periodical:

Advanced Materials Research (Volumes 588-589)

Edited by:

Lawrence Lim

Pages:

1019-1022

Citation:

B. F. Duan et al., "The Application of Tunnel Monitoring and Measurement in Yanjia Tunnel of Guzhu Expressway", Advanced Materials Research, Vols. 588-589, pp. 1019-1022, 2012

Online since:

November 2012

Export:

Price:

$38.00

[1] Cao xue. Construction monitoring of shallow buried period in specialty highway tunnel[J]. Shanxi Science and Technology of Communications, 2010, 3:59-61. (in Chinese).

[2] Qin dongping. Vertical settlement analysis of subway tunnel[J]. Quality papers of No. 7 annual meeting of Tianjin Civil engineering society, 2005: 233-236. (in Chinese).

[3] Huang hongwei. The longitudinal deformation analysis of shield tunnel[J]. Chinese Journal of Underground Space and Engineering, 2002, 22(3): 244-251. (in Chinese).

[4] Zhu min. The longitudinal uneven settlement numerical simulation analysis of Nanjing crossriver tunnel[J]. Conference proceedings of NO. 1 engineering safety and protection academic meeting, 2008: 541-546. (in Chinese).

[5] Zhang jianxun. Test monitoring technology of tunnel project[M]. Beijing: China Communications Press, 2005. (in Chinese).