Power Grid Construction Project Cost Risk Factors Analysis Based on the Fishbone Diagram Theory

Abstract:

Article Preview

Combined with the characteristics of the power grid construction projects, based on the fishbone diagram theory, the paper gradually identifies the cost risk factors in power grid construction projects according to the project construction process of project decision-making and feasibility study phase, design and bidding phase, construction phase,and completion of final accounts and summary evaluation phase. The study provides a certain amount of reference for power grid construction project risk management and controlling grid construction costs.

Info:

Periodical:

Advanced Materials Research (Volumes 622-623)

Edited by:

R. Sivakumar

Pages:

1852-1855

DOI:

10.4028/www.scientific.net/AMR.622-623.1852

Citation:

D. X. Niu et al., "Power Grid Construction Project Cost Risk Factors Analysis Based on the Fishbone Diagram Theory", Advanced Materials Research, Vols. 622-623, pp. 1852-1855, 2013

Online since:

December 2012

Export:

Price:

$35.00

[1] Ge Zhaohui. Research on Risk Management of Power Project Cost[D]. Beijing: North China Electric Power University, (2008).

[2] Guo ying. Study on Total Risk Management of Highway Engineering Cost[D]. Haerbin: Northeast Forestry University, (2006).

[3] Huang Wenjie. Study on Power Transmission Engineering Project Risk Management[D]. Beijing: North China Electric Power University, (2007).

In order to see related information, you need to Login.