Value Engineering-Based Selection Strategies of Construction Scheme

Abstract:

Article Preview

There are usually more than one construction schemes available in the process of engineering construction, and an optimized scheme selection is directly related to construction’s investment returns. Hence, using value engineering to optimize construction scheme selection has its practical significance. This paper, based on the basic principles of value engineering, builds the new model of comparison and selection of construction schemes through the comprehensive analysis of its function and cost, and selects the construction scheme which has better comprehensive result through quantitative method. Meanwhile, the systematic analysis of engineering example is carried out.

Info:

Periodical:

Advanced Materials Research (Volumes 671-674)

Edited by:

Yong Huang, Tai Bao and Hong Wang

Pages:

3065-3068

Citation:

M. Cheng et al., "Value Engineering-Based Selection Strategies of Construction Scheme", Advanced Materials Research, Vols. 671-674, pp. 3065-3068, 2013

Online since:

March 2013

Export:

Price:

$38.00

[1] Zhou Xu The Selection of Scheme under Value Engineering Guidance 【J】 Sichuan Building Science, 2003(12): P123—124.

[2] Wang Guifen The Application of Value Engineering in Scheme Optimization 【J】 Low Temperature Architecture Technology, 2009(7): P119—120.

[3] Li Zhisheng Economics of Architectural Technology 【M】 Chengdu: Southwest Jiaotong University Press, (2009).

[4] Du Yingji Value Engineering Application in Concrete Mix Proportion Design【J】Concrete, 2008 (10): P21—24.