The Implementation of Sampling Plan for Optimal Inspection Allocation in Multi-Station Systems with Consideration of Rework

Abstract:

Article Preview

This study explores sampling plans for optimal inspection allocation in multi-station systems with consideration of rework. After components have processed from each workstation in a serial production system, we can apply different sampling plans for inspection in order to maintain the outgoing quality level. The defective components that are detected at each sampling plan will return to the specific workstation to rework. This study proposes a minimum total cost model with a proper sampling plan after each workstation, which can help people to manager production better.

Info:

Periodical:

Edited by:

Daizhong Su, Qingbin Zhang and Shifan Zhu

Pages:

393-396

DOI:

10.4028/www.scientific.net/KEM.450.393

Citation:

H. Rau et al., "The Implementation of Sampling Plan for Optimal Inspection Allocation in Multi-Station Systems with Consideration of Rework", Key Engineering Materials, Vol. 450, pp. 393-396, 2011

Online since:

November 2010

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.