Papers by Keyword: Enlarging Construction

Paper TitlePage

Authors: Mei Yan, De Yun Ding, Xiu Ren Yang, Xiu Ren Yang, Wei Dong Lu, Wei Ning Liu, Ai Min Li
Abstract: There is no engineering experience for metro station construction by the PBA (Pile-Beam-Arch) method to enlarge an existing large-size shield tunnel in China. During enlarging construction by the PBA method, the spatial mechanical and deformational characteristics of metro station structure are still not clear. In this paper, the Gaojiayuan station is taken as an engineering background to study the spatial mechanical and deformational characteristics during enlarging construction by the PBA method. Based on soil-structure interaction theory, a three-dimensional finite element model is built to simulate the enlarging construction by the PBA method. The three-dimensional numerical results can be regarded as a valuable reference for enlarging construction by the PBA method in Beijing metro line 14.
1673
Authors: Mei Yan, Xiu Ren Yang, Ai Min Li, Wen Jun Wang, De Yun Ding
Abstract: With the speedy development of Beijing mass transit, the land for metro engineering construction is becoming more and more insufficient; moreover, more and more complicated building environment problems are coming forth in future. In a complex building environment, how to choose available construction method to fast, safely and economically build metro engineering is worthy to be urgently studied in Beijing mass transit. Taking the experiment project of Beijing metro line No.14 as an engineering background, a new construction method that a running tunnel is firstly built by large-size shield method and then a metro station is constructed by shallow mining method to enlarge existing large-diameter shield tunnel is presented in this paper. Based on the building conditions of the experiment project, three architectural design schemes for the metro station and two kinds of construction plans are briefly introduced, and their advantages and disadvantages are analyzed as well. The new construction method can be used as a reference for the design and construction of metro engineering in China in the future.
2731
Showing 1 to 2 of 2 Paper Titles