Authors: Rui Yan Liu, Yi Ping Yuan, Shu Guang Tian, Xiao Juan Li
Abstract: Reasonable logistics system plays a fundamental role in the process of regional economic development. With the development of Xinjiang's energy resources conversion strategy is ceaseless and thorough, as the country imported energy and scarce mineral resources international channel, Xinjiang internal and external logistics hub action are highlighted with each passing day. In this paper the complex network theory is applied to the Xinjiang regional logistics network, important cities, ports, warehousing point for a node to connect these nodes highway straight-line distance of the railway side, constructed the Xinjiang regional characteristics of the logistics network model. Select the node degree distribution, betweenness, average path length, clustering coefficient as a measure, static statistical properties of the network are analyzed. Provide basic data for the Xinjiang regional logistics network.
804
Authors: Zhi Ling Yuan, Yi Ping Yuan, Meng Yang
Abstract: Job Shop scheduling problem, the essence of which is the resources scheduling problem, which has been proved to be a complete NP-hard problem. It has importantly realistic effect on further research, and has become a hot spot of research now. According to the practical Job Shop, as equipment resources are not unique, there are several machine tools with high frequency, while the number of that of low frequency is only one; the working procedure of processing components are also quite different, so we have put forward the Genetic Algorithm considering the sequence and, simultaneously, the machine choice. For reaching the shortest producing period, this method adopts Gemini string to encode, combining with the characteristics of the resources scheduling problem, and designs the unique way of Crossover and Mutation, meanwhile, it shows that the algorithm is effective through a specific example simulation analysis.
799
Authors: Yi Ping Yuan, Wen Lei Sun, Xiao Juan Li
Abstract: In network manufacturing, different manufacturing resources have different functions and attributes, the evaluation method for manufacturing resources becomes ever more important and urgent to select ‘the best resource’ in product development process. This paper gives evaluation indicator for manufacturing resources; combining grey correlative analysis with hierarchical analysis method, brought forward to apply multi-hierarchy grey correlative analysis into manufacturing resources, researched deeply its principle, algorithm and evaluation execution process, and finally gave analysis sample.
1386
Authors: Yi Ping Yuan, Wen Lei Sun, Shuai Huang, Yi You Ni
Abstract: The Qing-ling machine is the cleaning part of Comb-type cotton picker. Its working performance directly affects the complete machine efficiency. In order to improve popularizing rate of Comb-type cotton picker, combining with the cotton varieties, the plant characteristics, climatic conditions and the harvests requirements in Xinjiang, the reasonable structures, transmission system and design parameters of Qing-ling machine are put forward. Virtual prototypes of key components are set up under Pro/E. the kinetic simulation data are obtained by using ADAMS. Simulation results prove design correctness and provide relevant data for further research.
286
Authors: Xiao Juan Li, Yi Ping Yuan
Abstract: Multi-task scheduling networkis extended based on the complex network theory, from new angles and perspectives to study the multi-task scheduling. The description of method and related mathematical models of complex and multi-task directed network aregiven. Combined with topology of the product development process and their own characteristics,the evaluation model and algorithmto describe the importance of the event node are presented. It can assess the nature ofdifferent nodes effectively, including the key nodes, at the same time,the scheduling algorithm based on the importance of active nodes hasbeen proposed.The study has a certain significance toarrange the execution of tasksin complex product development process reasonably and realize optimal allocation of manufacturing resources.
1003
Authors: Wen Lei Sun, Yi Ping Yuan, Yi Fang Zhong, Li He, Jao Guo
Abstract: The petroleum aiguille, whose capabilities directly affect the quality, speed and cost of artesian well, is the primary rock breaker in the petroleum and natural gas industry. This paper has researched the reverse design of imported and high-powered petroleum aiguille, including the numerical reverse design, the revivification of dimension, the finite element analysis of numerical model, the simulation of Numerical Control(NC)machining and so on. Through analyzing and redesigning the complicated parts of petroleum aiguille and numerical making server, the manufacturer could absorb quickly and develop the overseas advanced products, step up the development-level of petroleum exploitation facilities, and reduce the cost of petroleum exploitation.
4046
Authors: Ying Zhu, Hai Feng Huang, Yi Ping Yuan
Abstract: MG workflow can be defined as the composition of manufacturing activities which
execute on heterogeneous and distributed manufacturing resources in a well-defined order to
accomplish a specific goal. The execute process of MG workflow includes model building, service
finding, service selecting, service binding and service invocation. Service selecting is one of the most
critical components in MG workflow. So, this research brings forth AHP-based grid nodes choosing
method, which takes time, quality, cost, service, fidelity, reliability, policy (TQCSFRP) as rules, and
chooses best resource node as target. The dynamic service binding and invocation between an activity
request and an optimal service provider is realized when a workflow is in execution. Higher flexibility
and self-adaptability of workflow management are achieved. Furthermore, the application
architecture is depicted at the end of the paper to illustrate the utilization of MG workflow.
1439
Authors: Yi Ping Yuan, Mei Nian, Wen Lei Sun
Abstract: The Manufacturing Grid domain is characterized by rapid and substantial change over
time. The entire process of product development can be quite complex. The activities are expected to
be executed on heterogeneous resources which are geographically distributed. However, traditional
modeling systems use static workflow models which can not automatically redesign the business
process and mask the isomerism of the resources. In this article, an open and extensible framework of
MG workflow is given, which complies with the standard of WFMC and GGF. A formalized
definition workflow model is proposed including process model, organization model, resource
model, and service mode. The integrated workflow model can be used to dynamically represent a
business process and other aspect s of Manufacturing Grid workflow.
1431
Authors: Feng Xiong, Yi Ping Yuan, Yu Ying Wang, Guang Wen Wang
Abstract: In manufacturing Grid workflow, multiple tasks share a common and limited resource pool.
In order to solve task scheduling in multi-process with resource constraints under MG workflow, the
Task-Resource Constrained model is set up to descript the assignment relation between task and
resource. The framework of the task scheduling and the scheduling policies are also presented that
can readjust the tasks according to the priority rules and the time parameters in the process. Then we
present a heuristic scheduling algorithm that includes multiple policies. The heuristic scheduling
algorithm will update the critical path of DAG (Direct Acyclic Graph) and the beginning time of
post-tasks. MG Workflow engine can dynamically schedule the resources according the task
requirement. An example is given to illustrate the method at last.
1425
Authors: Mutellip Ahmat, Li Zheng, Yi Ping Yuan
177