Sort by:
Publication Type:
Open access:
Publication Date:
Periodicals:
Search results
Online since: October 2014
Authors: Tao Yu, Chao Jun Fu, Xiao Mei Hu
Therefore, the green building is a very complicated system because it is required not only to meet the traditional architectural features and requirements, but also to meet the green requirements of saving land, material, water, energy and protecting environment.
green building construction plans architectural design electrical equipment professional design main structure professional design equipment construction simulation equipment operation simulation structural stress calculation structural construction simulation wind environment simulation energy consumption simulation light environment simulation acoustic environment simulation emergency processing simulation Fig.3 The computer-aided decision-making system of green building Green Monitoring and the Corresponding Monitoring Content In the past, people put more emphasis on the end of the pollutant control and treatment, while the whole process monitoring and prevention of pollutants are ignored.
green building construction plans architectural design electrical equipment professional design main structure professional design equipment construction simulation equipment operation simulation structural stress calculation structural construction simulation wind environment simulation energy consumption simulation light environment simulation acoustic environment simulation emergency processing simulation Fig.3 The computer-aided decision-making system of green building Green Monitoring and the Corresponding Monitoring Content In the past, people put more emphasis on the end of the pollutant control and treatment, while the whole process monitoring and prevention of pollutants are ignored.
Online since: August 2014
Authors: Shao Jun Zhang
The construction quality control measures of reinforced concrete cover research
Zhang Shaojun
chongqing water resources and electric engineering college, Chongqing, 402160, China.
Each working procedure when completed, is first and foremost GongBan self-checking, signature, after the qualified report to the project department professional engineers, by professional engineers can be reported to the supervision engineer acceptance sampling are eligible. 9.1 strictly carry out the first engineering approval system According to the serial number of unit division, the refinement, the procedure to each individual component before construction should be reported to the construction plan of the first article, after approval of the implementation in the construction of the first article, after the completion of the project of the first article should be summarized, to improve the process, attention should be paid to the issues discussed, such as disclosure, clear, to ensure the subsequent construction engineering quality is not lower than the first. 9.2 to strengthen management, to formulate the corresponding rewards and punishment measures The project intends to set
Each working procedure when completed, is first and foremost GongBan self-checking, signature, after the qualified report to the project department professional engineers, by professional engineers can be reported to the supervision engineer acceptance sampling are eligible. 9.1 strictly carry out the first engineering approval system According to the serial number of unit division, the refinement, the procedure to each individual component before construction should be reported to the construction plan of the first article, after approval of the implementation in the construction of the first article, after the completion of the project of the first article should be summarized, to improve the process, attention should be paid to the issues discussed, such as disclosure, clear, to ensure the subsequent construction engineering quality is not lower than the first. 9.2 to strengthen management, to formulate the corresponding rewards and punishment measures The project intends to set
Online since: November 2012
Authors: Cheng Hu, Bo Xu, Shui Bao Zhang, Shou Zhi Xu
The manual monitoring requires professionals carrying testing equipment to the monitoring site, it is hard to detect the small relative deformation and cannot accomplish continuous acquisition.
Landslides normally occur when the strain accumulated due to percolating rain water develops hydrostatic pressure beyond the elastic limit of the rock.
Landslides normally occur when the strain accumulated due to percolating rain water develops hydrostatic pressure beyond the elastic limit of the rock.
Online since: November 2012
Authors: Tao Ge
With a collection of large amounts of information, Tang Xiuyi and other professionals came to the conclusion that the mercury content in the coal of China is particularly high, with the arithmetical mean of only 0.1×10-6 the country over and the arithmetical mean of 0.17×10-6[6] in the coal of North China.
But mercury is a kind of element that volatilizes easily; it can go in to air while burning or go in to soil or water together with ash content and such pollution needs our attention.
But mercury is a kind of element that volatilizes easily; it can go in to air while burning or go in to soil or water together with ash content and such pollution needs our attention.
Online since: January 2014
Authors: Ning Wang, Yu Ling Zhao, Dong Mei Qian, Zhen Yun Chang
Because at the other end of the "Cloud", there are the most professional team in the world helping you to manage information, and the world's most state-of-the-art data center to help you to save the data.
Because at the other end of the "cloud", there are professional IT staffs helping you maintain hardware, helping you install and upgrade software, helping you to prevent viruses and all kinds of network attacks, helping you to do everything you've done on the PC.
Just like water production in accordance with the state regulations of relevant departments, it needs the appropriate laws and regulations promulgated by the state to constraint cloud computing service providers’ behavior and technology.
Because at the other end of the "cloud", there are professional IT staffs helping you maintain hardware, helping you install and upgrade software, helping you to prevent viruses and all kinds of network attacks, helping you to do everything you've done on the PC.
Just like water production in accordance with the state regulations of relevant departments, it needs the appropriate laws and regulations promulgated by the state to constraint cloud computing service providers’ behavior and technology.
Online since: May 2014
Authors: Yong Hong Chen, Yang Zhang
In the last a few decades, professionalization has been the main current of building trades development, like building, structure, water, electric, heating, intelligentize, fire control and safety.
Since BIM has the powerful and integrated message resource of life cycle, sharing cooperation based on BIM information can make every professional team to collaborate for one goal.
For multitudinous professional teams, premise of combined effort is reinforcing management and communication.
Since BIM has the powerful and integrated message resource of life cycle, sharing cooperation based on BIM information can make every professional team to collaborate for one goal.
For multitudinous professional teams, premise of combined effort is reinforcing management and communication.
Online since: September 2014
Authors: Jian Kun Wang
Which is more common is post-work-repair, because the operators lack of equipment maintenance concept, professional technology level is limited, the abnormal situation in, don't know how to do maintenance, as long as the equipment can operate, working people would not consider maintenance, resulting in small fault found no, wait for a lot of equipment failure, but can't solve, had to stop and wait for the specialist for processing.
Encourage internal professional maintenance personnel more than learning, and constantly improve their work skills.
China water transport (the second half of the month), 2012, 5 (11) : 13
Encourage internal professional maintenance personnel more than learning, and constantly improve their work skills.
China water transport (the second half of the month), 2012, 5 (11) : 13
Online since: August 2014
Authors: Anna Šmeringaiová, Peter Šmeringai
Data were analysed using Lab View Professional Development System, including the Sound and Vibration Toolset and Order Analysis Toolset
Digital prototype of this stand was created in Autodesk Inventor Professional.
Bičejová, Water Jet Technology Head Vibration Generation due to Selected Technology Parameters Fluctuation Effect during Alloy Cutting, Applied Mechanics and Materials 308 (2013) 81-86
Digital prototype of this stand was created in Autodesk Inventor Professional.
Bičejová, Water Jet Technology Head Vibration Generation due to Selected Technology Parameters Fluctuation Effect during Alloy Cutting, Applied Mechanics and Materials 308 (2013) 81-86
Online since: June 2014
Authors: Chang Liang Shi, Yi Shun Zhang, Ling Zhang, Yuan Yang Liu, Fei Yue Wang
The bottom supply water system provide uniform rising water, the central supply water system provide tangential weak swirling flow.
The bottom supply water system to provide rising water of separation, the central supply water system provide the tangential swirling, swirling field can adjust under different condition.
To get good separation effect, the bottom supply water should be smaller.
After repeated debugging, set the parameters: rising water 0.2m3/h, swirling flow 0.2m3/h.
Acknowledgements This work was financially supported by the Mineral Processing Engineering, National Professional Characteristics(TS12245),and Henan Polytechnic University crosswise tasks(H12-468).
The bottom supply water system to provide rising water of separation, the central supply water system provide the tangential swirling, swirling field can adjust under different condition.
To get good separation effect, the bottom supply water should be smaller.
After repeated debugging, set the parameters: rising water 0.2m3/h, swirling flow 0.2m3/h.
Acknowledgements This work was financially supported by the Mineral Processing Engineering, National Professional Characteristics(TS12245),and Henan Polytechnic University crosswise tasks(H12-468).
Online since: November 2011
Authors: Shi Liang Yang, Wei Hong Tang, Hong Wei Yang, Chao Wu
(3) Influences of water content.Water is generally held to be conductive and able to eliminate electricity because on the surface of solid-state medium, a layer of conductive water film is adsorbed to improve the conductivity of solid-state media.
But there is no water film formed for petroleum.
In addition, the relative motion between oil and water will produce static electricity.
The water content of 1% to 5% mixed in the oil is most hazardous
Therefore it should be highly valued by professional of fuels of troop.
But there is no water film formed for petroleum.
In addition, the relative motion between oil and water will produce static electricity.
The water content of 1% to 5% mixed in the oil is most hazardous
Therefore it should be highly valued by professional of fuels of troop.