Search Options

Sort by:

Sort search results by

Publication Type:

Publication Type filter

Open access:

Publication Date:

Periodicals:

Periodicals filter

Search results

Online since: December 2011
Authors: Bo Cui, Hao Liang Han
Modeling of surface subsidence based on time function HaoLiang Han1,2,a, Bo Cui1 1School of Civil and Environment Engineering, University of Science and Technology Beijing, Beijing, China, 100083 2 Department of Energy and Mineral Engineering, Pennsylvania State University, University Park, PA, USA, 16801 ahaolianghan@126.com Keywords: Time function; Subsidence; Dynamic modeling; Mining Abstract.
Online since: May 2012
Authors: Jian Rong Yang, Yu Bai, He Xian Su, Zheng Cong Lai
Full-scale Dynamic Testing of Qingshui River Bridge Jianrong Yang 1, a, Yu Bai 1,b, Hexian Su 1,c and Zhengcong Lai 1,d 1 Faculty of Civil Engineering and Architecture, Kunming University of Science & Technology (Chenggong Campus), Kunming, 650500, China acarpenter_y@sina.com, bbaiyu_kust@yahoo.com.cn, csxhh870@163.com, dlzckzs@163.com Keywords: multi-girder bridge, full-scale testing, dynamic testing, ambient vibration testing, forced vibration testing Abstract.
Engineering Structures, 2007, 29: 1052–1063 ].
Online since: December 2010
Authors: Rong Bin Jiang, Zhe Pan, Hui Li Wang
Introduction Since the first appearance of cable-stayed bridge in 1956, the study of its dynamic performance has been under the universal concern of the civil engineering field of bridge, which is due to people’s attention to the dynamic characteristics and aerodynamic performance of suspension bridge.
Wind-Resitant Stability Analysis of the Prestressed Concrete Cable-Stayed Bridge [J].World Information on Earthquake Engineering, 2005, 21(3):144-147.
Online since: May 2012
Authors: Chang Liang Zhang, Liang Zhao, An Li, Yi Jun Zhang
China JK Institute of Engineering Investigation and Design, Xi’an, Shaanxi, 710043, China 2.
Introduction Landslide controlling is a complex problem in geotechnical engineering.
Hovland, in: Division Proceedings of the American Society of Civil Engineers, Vol. 103 (1977), p. 971-986
Deng, in: Chinese J. of Geotechnical Engineering, Vol. 25 (2003), p. 611-614.
Wang, in: Chinese J. of Geotechnical Engineering, Vol. 23 (2001), p. 524-529.
Online since: February 2018
Authors: Viktor Borzovič, Kamil Laco
Viktor Borzovič PhD2,b 1Slovak University of Technology, Faculty of Civil Engineering, Radlinského 11, 810 05 Bratislava, Slovak Republic akamil.laco@stuba.sk, bviktor.borzovic@stuba.sk Keywords: approach/transition slab, transition zone, shear resistance Abstract.
The analysis is the part of the engineering tool for the bridge designers.
According to length and width of the slab, the engineer can easily choose the shear reinforcement diameter and its distribution.
Results from this analysis will be used for the creation of the engineering tool for design of the shear reinforcement of the reinforced concrete approach slab.
Preliminary Engineering Tool for the Sheer Reinforcement Design Inspiration for the creation of the engineering tool came based on actual design standard (OTN 73 6244 [1]), because the standard already contains the tool for the determination of bending moments and thickness of the slab according to its length in form of graph.
Online since: January 2013
Authors: Jia Fu Xiao, Jin Gang Yang
Improved Plastic-Al Pipe Based System for Refrigeration of Energy Existed in Urban Sewage Yang Jin-gang 1,a, Xiao jiafu2,b 1 School of Municipal and Environmental Engineering, Jilin Institute of Architectural and Civil Engineering, Changchun China 130118 2Commad College of Chinese people, s Armed Police Forces a49308395@qq.com, b kevin_lee_001@hotmail.com Keywords: environmental engineering; sewage energy; heat pump; coefficient of performance Abstract.
Online since: July 2011
Authors: Hai Tao Li, Cheng Qiao
Comprehensive Evaluation Method for Interchange Project Based on Projection Pursuit Haitao Li 1,a,Cheng Qiao1,b 1School of Civil Engineering and Architecture, Anhui University of Science and Technology, Huainan Anhui 232001,China ahurricane2005@yahoo.cn, bliht@aust.edu.cn Keywords: Road Engineering; Comprehensive Evaluation Method; Projection Pursuit; Interchange Abstract: Comprehensive evaluation method for interchange project is built on the basic principle and the solution process of the projection pursuit algorithm.
Journal of Sichuan University(Engineering Science Edition), 2000 ,32(4): 20-24
Online since: June 2014
Authors: Xin Wen Wang
Problems and Solutions in the Design of Rainwater Pipe Networks Xinwen Wang Department of Civil Engineering, Luoyang Institute of Science and Technology, Luoyang, China Wangxinwen2014@126.com Keywords: rainwater pipe networks, designed for flow of rainwater, hydraulic calculation.
First, almost all the designers in order to facilitate the calculation toke the same and for the same engineering.
(1) If conditions permit, as designers must be engineering survey and measurement some key parameters.
Code for design of outdoor wastewater engineering (GB50014-2006) (2011 edition) [s].
Wastewater Engineering [M].
Online since: September 2014
Authors: Guang Fan Li, Yan Li, Kai Dong
The Application of BIM in the Restoration of Historical buildings Li Yan1, 2 Dong Kai3 Li guang fan1 ( 1, College of Civil Engineering and Architecture ,Hainan University, Hainan Haikou 570228, China 2 School of Management and Economics, Tianjin University, Tianjin 300072, China, 3.
The digital information model gathers the most digital information generated in the full-life circle of an engineering project on basis of 3D geometrical information regarding engineering facilities.
At present, digital restoration design hasn't been widely used in engineering practice.
Civil engineering information technology, 2012, (4): 43-46 [2] Chen Wei and Zhang Xingguo.
Mechanical Engineer, 2002, (1): 13~15 [7] Jukka Jokilehto.
Online since: October 2012
Authors: Zhi Li, Feng Zhu
Study on testing the relative density of coarse aggregate by Vacuum Method instead of basket method LI Zhi1, a, and ZHU Feng1,b 1 Department of Civil Engineering, Shandong Jiaotong University, Jinan, Shandong 250023 aemail: lizhilj@163.com, bemail:sdzhuf@163.com Keywords: Vacuum Method; basket method, relative density of coarse aggregate; mixture design of asphalt mixture; highway engineering Abstract.
The bulk volume relative density Ri and apparent relative density Ri of different specification coarse aggregate in calculation formula are tested by basket method required by Engineering> (JTG E42-2005) T0304-2005.
So, if we test the relative density of coarse aggregate by vacuum method in stead of basket method , the test time will decrease to a great extent and the working efficiency will be raised, which has important significance for the engineering. 1.
Referring to the test methods (vacuum method) of maximum theoretical density of bituminous mixture in the Engineering> (JTG E20-2011).
The density of crushed stone of different specification selected in table 5 are tested by T0304-2005 coarse aggregate density and water content test methods(basket method) according to the Engineering>.