Sort by:
Publication Type:
Open access:
Publication Date:
Periodicals:
Search results
Online since: July 2013
Authors: Ai Hua Wang, Jie Min Liu, Ping Che, Gui Hua Wang
According the data of XRD, the average grain size of ZnO is 15.1 nm consistent with the result observed by TEM (16.3 nm).
The possible reason is that too much MB darkened the solution leading to the reduction of light irradiation to the solution.
The possible reason is that too much MB darkened the solution leading to the reduction of light irradiation to the solution.
Online since: July 2013
Authors: Wei Ding, Tao Xu, Min Song, Wei Gu
Specifically, NP pilots (i.e. ’s for ) and edge null subcarriers are embedded into x to split the data subcarriers into isolated data clusters.
These data subcarriers, i.e.
for with ND as the total number of data subcarriers, carry the transmitted information.
These recovered data will be demodulated (e.g., QPSK demodulation) into information bits.
QPSK is used to modulate the data and pilot subcarriers.
These data subcarriers, i.e.
for with ND as the total number of data subcarriers, carry the transmitted information.
These recovered data will be demodulated (e.g., QPSK demodulation) into information bits.
QPSK is used to modulate the data and pilot subcarriers.
Online since: August 2013
Authors: Bao Lin Li, Ju Qin Wang
The data were rounded handled.
Use MATLAB2012 software to calculate the model data.
We obtained the original data sequence of variablesx(0) by the raw data.
Due to the different data distribution characteristics of oil ,natural gas and coal data, the simple gray prediction method prediction error is greater than 3%.
So, when we use gray prediction method to predict the oil and gas data, calculate corresponding residuals on the basis of year forecast data.
Use MATLAB2012 software to calculate the model data.
We obtained the original data sequence of variablesx(0) by the raw data.
Due to the different data distribution characteristics of oil ,natural gas and coal data, the simple gray prediction method prediction error is greater than 3%.
So, when we use gray prediction method to predict the oil and gas data, calculate corresponding residuals on the basis of year forecast data.
Online since: June 2015
Authors: G. Shanmugasundar, R. Sivaramakrishnan, M. Rajmohan
This system also performs trajectory planning, 3D simulation, auto-operation, ultrasonic signal analysis and 3D reconstruction according to the measured flow data.
Korayem et. al [6] delivered the exact procedure and methods for Design, modelling, development and experimental analysis of a six degree freedom robot, which is suitable for industrial applications, In their research work the followed the assumption that, the robot each joint link has an independent DC motor type actuator, with gear reduction unit and measuring sensor system for angular joint position of each and every robot elements.
(1) Step 3: Outer diameter, Mean diameter, Pitch : The core diameter is interpreted with the available standard data’s of IS: 4694 – 1968 for normal series of square thread.
From the standard data the pitch of the screw and outer diameter are interpreted.
Korayem et. al [6] delivered the exact procedure and methods for Design, modelling, development and experimental analysis of a six degree freedom robot, which is suitable for industrial applications, In their research work the followed the assumption that, the robot each joint link has an independent DC motor type actuator, with gear reduction unit and measuring sensor system for angular joint position of each and every robot elements.
(1) Step 3: Outer diameter, Mean diameter, Pitch : The core diameter is interpreted with the available standard data’s of IS: 4694 – 1968 for normal series of square thread.
From the standard data the pitch of the screw and outer diameter are interpreted.
Online since: July 2011
Authors: Qun Zhen Fan, Jin Qing Liu
Valid data of each line is 720 points, that is, href maintain 720 points.
Image acquisition and data transfer part of VHDL module mainly includes sample synchronization mold, write data module, read data module, delay module, bus module and so on, each module related to each other by signals.
DM642 through interrupt 7 in interrupt handling using QDMA to read a row of FIFO data once time, first for DCT transform, data quantitatively and reverse quantization, then reverse DCT transform, and last to send data with a QDMA.
There are redundant code reduction, re-defined data types, cycle decomposition, use inline functions and memory optimization.
In the acquisition circuit design, because it use FIFO as video input buffer memory between DSP and SAA7111A, sampling analogy video data, while DSP can read data from FIFO through data bus, the two work independently of each other.
Image acquisition and data transfer part of VHDL module mainly includes sample synchronization mold, write data module, read data module, delay module, bus module and so on, each module related to each other by signals.
DM642 through interrupt 7 in interrupt handling using QDMA to read a row of FIFO data once time, first for DCT transform, data quantitatively and reverse quantization, then reverse DCT transform, and last to send data with a QDMA.
There are redundant code reduction, re-defined data types, cycle decomposition, use inline functions and memory optimization.
In the acquisition circuit design, because it use FIFO as video input buffer memory between DSP and SAA7111A, sampling analogy video data, while DSP can read data from FIFO through data bus, the two work independently of each other.
Online since: July 2019
Authors: Roberta Nipoti, Antonella Parisini
This understanding is very recent, and transport data for such annealing conditions are not yet available.
However, in [11], for the best fit of the data in low doped samples the anisotropy of the NOP scattering resulted necessary, and for a best fit of the data in higher doped samples a Hall factor dependence on the doping level was necessary too.
These latter are also the σ(T) data reported in Fig. 1(a), and show a 2D-VRH, as Fig. 2(a) demonstrates.
Crosses: data taken by heating the sample after a rapid cooling to the lowest temperature; empty circles: data taken after a slow reduction of the temperature sample.
Continuous lines: fits of the data with the parameters reported in the text.
However, in [11], for the best fit of the data in low doped samples the anisotropy of the NOP scattering resulted necessary, and for a best fit of the data in higher doped samples a Hall factor dependence on the doping level was necessary too.
These latter are also the σ(T) data reported in Fig. 1(a), and show a 2D-VRH, as Fig. 2(a) demonstrates.
Crosses: data taken by heating the sample after a rapid cooling to the lowest temperature; empty circles: data taken after a slow reduction of the temperature sample.
Continuous lines: fits of the data with the parameters reported in the text.
Online since: July 2011
Authors: K.F. Chen, W.P. Sung, C.C. Lin, T.Y. Yeh, C.M. Kao
Except for the biotic mechanism, the supplied nZVI can also cause the TCE degradation via abiotic mechanism through oxidation-reduction process.
The variations of pressure in the headspace were recorded continuously by a computer equipped with a DATA LAB Graphical Software (840053, Sper Scientific Ltd.).
The variations of pressure in the headspace were recorded continuously by a computer equipped with a DATA LAB Graphical Software (840053, Sper Scientific Ltd.).
Online since: August 2019
Authors: Babak Jafarzad Eslami, Andrea Del Grosso
Finally, comparison of the failure modes between unreinforced and reinforced masonry walls reveals efficiency of using the rubber bearing isolation (passive control vibration devices) for a reduction in acceleration and an increase in the structural resistance to earthquake excitations [2].
It should be noted that all records are extracted from the data base of Iran's seismograph Site, affiliated to the Housing Research Center [5], and after applying the necessary corrections (Signal Processing) by Sesimosignal software.
It should be noted that all records are extracted from the data base of Iran's seismograph Site, affiliated to the Housing Research Center [5], and after applying the necessary corrections (Signal Processing) by Sesimosignal software.
Online since: October 2014
Authors: Zbyšek Pavlík, Jan Fořt, Anton Trník
Due to its latent heat storage, the applied PCM represents promising way for reduction of buildings energy consumption spent for heating and air conditioning.
Looking at bulk density and matrix density data, the low powder density of Micronal yields significant decrease of these both parameters for PCM modified plasters.
Looking at bulk density and matrix density data, the low powder density of Micronal yields significant decrease of these both parameters for PCM modified plasters.
Online since: August 2011
Authors: Li Hong Qiao, Sheng Ping Lv
The results of these researches show that the integration of the two functions may bring significant improvements with regard to a variety of performance measures through elimination or reduction in scheduling conflicts, reduction of flow-time and work-in-process, improvement of production resources utilization and adaptation to irregular shop floor disturbances [8].
The CLPP is an improved NLPP in which the process planners utilizing the feedback mechanism from the dynamic workshop status to filter some inappropriate process plans at the stage of process planning based on the real-time workshop data.
Seethaler et al [24] provided an improved integrated interface between the planning and control activities which both facilitate the identification and scheduling of suitable monitoring tasks and allow the updating of process plan data from real time.
However, for this type of integration it has to re-generate process plans in every scheduling phase based on the real-time data of the current status, the real-time data is hard to be updated and the process planning time is very strict.
The CLPP is an improved NLPP in which the process planners utilizing the feedback mechanism from the dynamic workshop status to filter some inappropriate process plans at the stage of process planning based on the real-time workshop data.
Seethaler et al [24] provided an improved integrated interface between the planning and control activities which both facilitate the identification and scheduling of suitable monitoring tasks and allow the updating of process plan data from real time.
However, for this type of integration it has to re-generate process plans in every scheduling phase based on the real-time data of the current status, the real-time data is hard to be updated and the process planning time is very strict.