Search Options

Sort by:

Sort search results by

Publication Type:

Publication Type filter

Open access:

Publication Date:

Periodicals:

Periodicals filter

Search results

Online since: September 2013
Authors: Gang Xue, Wei Yu Bai, Xian Wang
Finite Element Model updating of a prestressed concrete continuous bridge based on dynamic monitoring Gang Xue1,a, Weiyu Bai1 and Xian Wang1 1Architecture and Civil Engineering School, Inner Mongolia University of Science and Technology, Baotou 014010,China axuegang-2008@126.com Key words: Model updating; Sensitivity analysis; Ambient vibration; Finite element model Abstract: The finite element model modified technique based on optimization principle is benefit for the model updating of the large bridge structures.
ANSYS numerical analysis of engineering structure[M].Beijing: People's transportation press,2007,in chinese [4] Dongyan Lin,NED H.
Online since: January 2013
Authors: Mihai Budescu, Marius Teodor Muscalu, Andrei Radu, Nicolae Ţăranu, Eugen Florescu
Florescu2,e 1Technical University “Gheorghe Asachi” of Iasi, Faculty of Civil Engineering and Building Services, Dimitrie Mangeron Blvd. no. 43, 700050, Iasi, Romania, tel. 0040232-23.92.13 2Holcim (Romania) SA, Calea Floreasca Street no. 169 A, building B, Sector 1, Bucharest, Romania, tel. 004021-23.17.708 amtmuscalu@yahoo.com (corresponding author), bradu.andrei.d@gmail.com, cmbsinfex@yahoo.com, dtaranu@ce.tuiasi.ro, eEugen.Florescu@holcim.com Keywords: recycled aggregates, recycled steel fibers, roller compacted concrete (RCC).
Ţăranu, Use of recycled materials in pavement construction, International Symposium Highway and Bridge Engineering 2010, Iasi, Romania, 2010, 15-21
Online since: October 2012
Authors: Wen Ping Peng, Zhong Chu Tian, Tian Yong Jiang
Key Technologies of Construction and Control of Arch Cantilever Casting for Mupeng Bridge Wenping Penga , Zhongchu Tianb , Tianyong Jiangc School of Civil Engineering and architecture, Changsha university of Science and Technology, Changsha, Hunan, 410114, China apwp320@163.com, btianzhongchu@163.com, c363842978@qq.com Keywords: Reinforced concrete arch bridge, Inclined cable-stayed buckle and cantilever construction method, Construction technologies, Construction control technologies.
Engineering situation Mupeng bridge, located at the expressway from Sinan to Jianhe, is a reinforced concrete arch bridge with the main span of 165m.
Online since: December 2024
Authors: Tran Thi Thu Hien, Nguyen Sy Long
Lundström, Developing a Sustainable Solution for Recycling Electric Arc Furnace Dust via Organic Acid Leaching Engineering. 124 (2018) 1-9
León, Use of Blast Furnace Dust in the Production of Asphalt Concrete for Pavements, Performance and Environmental Contribution, Journal of Sustainable Architecture and Civil Engineering. 32 (2023) 224-232
Online since: October 2014
Authors: Vit Šmilauer, František Škvára, Petr Hlaváček
Alkali-activated fly ash foams - synthesis, chemo-physical properties and microstructure modeling Petr Hlaváček1,a, Vít Šmilauer1,b, and František Škvára2,c 1Department of Mechanics, Faculty of Civil Engineering, Czech Technical University in Prague, Thákurova 7, 166 29 Prague 6, Czech Republic 2Department of Glass and Ceramics, Faculty of Chemical Engineering, Institute of Chemical Technology, Technická 5, 166 28 Prague 6, Czech Republic apetr.hlavacek@fsv.cvut.cz, bvit.smilauer@fsv.cvut.cz, cfrantisek.skvara@vscht.cz Keywords: alkali-activation; fly ash; foam; chemical durability; mechanical properties Abstract.
Online since: January 2012
Authors: Yun Tao Yue, Yan Lin
A Novel High Power Factor Soft-switching Converter Yue Yuntao1, 2,a and Lin Yan3 1Beijing University Of Civil Engineering And Architecture, Beijing, China 2Beijing University of Aeronautics and Astronautics, Beijing, China 3School of Automation, Beijing University of Aeronautics and Astronautics, Beijing, China ae-mail: yueyuntao@bucea.edu.cn, be-mail: linyanee2@yahoo.com.cn Keywords: power factor correction soft-switching two-transistor forward Abstract.
A novel two transistor forward ZVT- PWM converter [C] ∥1997 International Engineering Management Conference.
Online since: May 2011
Authors: Nam Yong Jee, Hong Bum Cho
Prediction model for cementing efficiency of fly ash concrete by statistical analyses Hongbum Choa and NamYong Jeeb Department of Architectural Engineering, Hanyang University, Seoul, Republic of Korea ahbcho@hanyang.ac.kr, bnyjee@hanyang.ac.kr Key words: Cementing efficiency, Fly ash, Statistical analysis, Relative strength Abstract.
Bentur, The Science and Technology of Civil Engineering Materials, Prentice-Hall, New Jersey (1998)
Online since: May 2011
Authors: Peng Zhang, Wu Ying
Peak Cycle Stress Analysis of the II Type Dent on Pipeline Based on FE Calculation YING Wu1, a, PENG Zhang1,a 1 School of Civil Engineering and Architecture, Southwest Petroleum University, China awy_swpi@163.com Keywords: Pipeline; dent; finite element method; peak cycle stress.
British Gas, Engineering Research Station 1998
Online since: January 2012
Authors: Ying Gao, Yue Xin Han, Ming Bao Liu, Wan Zhong Yin, Jin Yao, Li Yi Duan
Physical Principle of X-ray Separatation and Pre-sorting Experiment on the Low Grade Ore of Mo and Ni Mingbao Liu 1,a ,Jin Yao 1,b ,Wanzhong Yin 1,c ,Liyi Duan2,d ,Ying Gao1,e and Yuexin Han1,,f 1 School of Resource and Civil Engineering, Northeastern University, Shenyang, 110004, China 2 Lanzhou Jinchuan New Material Limited Company,Jinchang,737100,China almb74@163.com,b.yaojin_82@hotmail.com, ,c yinwanzhong@mail.neu.edu.cn, d kbdgeduan@sina.com ,e.yychengbao_1983@126.com,f.hanyuexin@mail.neu.edu.cn Keywords:X-ray sorting.Ore separating.Beneficiation Abstract.
The X-ray separation experiment flow of ores containing Mo or Ni Results and discussions.The School of Mineral Engineering in Northeastern University has conducted X-ray pre-sorting research on the two kinds of ore samples mentioned above, and the experiment results are shown in Tab.1 and Tab.2.
Online since: February 2013
Authors: Chang Shui Feng, Ting Zhang, Qiao Yi Wang
Reliability of Duffing-van der Pol Oscillator with Delayed Feedback Control under Wide-band Noise Excitation Ting Zhang1, a, Changshui Feng1, b, Qiaoyi Wang1, c 1 School of mechanical engineering, Hangzhou Dianzi University Hangzhou 310018, People’s Republic of China a617563122@qq.com, bcsfeng@gmail.com, cwangqiaoyi1989@163.com Keywords: First passage failure, Delayed feedback control, Stochastic averaging, Reliability.
Yang, Effect of fixed time delay on stability and performance of actively controlled civil engineering structures, Earthquake Eng.
Showing 29781 to 29790 of 38808 items