Search Options

Sort by:

Publication Type:

Open access:

Publication Date:

Periodicals:

Search results

Online since: November 2012
Authors: Bao Xing Yue, Shuang Chen
The structure of system Real-time online monitoring system for air compressor is made up of three sections-- PC, intelligent data acquisition sub-station and on-site sensor. 1)PC parts We use PC computer with industrial grade(17 "flat screen color display, 256M RAM, 80G hard drive), which is equipped with an uninterruptible power supply and its operating system is WINDOWS2000 Professional.
PC software uses professional monitor configuration software to develop and prepare.
Temperature signal acquisition uses PT100 platinum resistance sensors to measure the fan on each one, two exhaust temperature, the motor temperature, cooling water temperature, oil temperature, stator temperature and others.
It measures the fan on each one, two exhaust temperature, the motor winding pressure, cooling water pressure, oil pressure, etc.
Fan start-stop state, the cooling water pump and other equipment running state are completed and collected by the switch input and output modules, others can receive auxiliary contact signal forms the switching equipment.
Online since: May 2014
Authors: Jian Ying Zhang, Xiang Feng
Through these manifestations, teachers and students know schools, and inspire the passion of learning professional.
The Design Principle of Water Landscape Transformation Water Landscape Reform Ideas.
The key points of waterscape design: one for the water quality, secondly the water form.
Coupled with poor water, water can not be timely supplement and updated.
Fig. 4-1 Two water two bridge Two water refers to the dynamic water and static water, A dynamic with static, have firm with soft, mainly reflects the philosophy of "water philosophy" and "water culture".
Online since: December 2013
Authors: Hong Ni, Ming Hui Li
But , the water and coal consumption , the total amount of discharge of industrial SO2 and nitrogen oxides, account for over 90%.
The industrial layout should be set as the form of " Development Zone (professional park) - Industry Zone - Agricultural Park - ecological protection zone". industry system according to the national level development zone - provinces - the professional Park Development Zone (advanced manufacturing industry, modern service industry, city agriculture park) architecture, as below.
The natural renewable energy (such as solar photovoltaic power generation/hot water etc.) should be collected and used more widely.
The tap water purification device, the kitchen garbage processing system, modular drainage water system and water reuse system also should be adopted.
We should pay attention to energy saving technology public service platform construction, improve the quality of professional business and update energy saving detection instruments and equipment.
Online since: December 2013
Authors: Zhi Huai Xiao, Hong Tao Zeng, Lin Lin Lin, Cong Feng
Water tank is used for storing test water.
This paper will build a water drop's motion model based on the simplifications of the motion process as follows: (1) The size of water drop forms once jetted out of the nozzle and keeps spherical afterwards; (2) There's no interaction between water drops; (3) Ignoring the water drop's evaporation[6].
Dynamic simulation.LabWindows/CVI is an interactive C language development platform, its powerful, flexible C language platform , professional test and control tool that used for data collection, analysis and display are organically combined, which provides an ideal software development environment for test system, automatic test environment system, data acquisition system, process monitoring system[8].
According to the simulated water drop trajectory in the air, the motion of water drop can be observed visually.
[4] Fuxin Jiang, Water jet rain device.
Online since: January 2014
Authors: Bo Yu, Zheng Wen Huang, Lin Chen, Hong Zhou
The best way for wastewater disinfection has been continuously studied by some professionals and scholar.
When the water quantity and water quality was changed, it is difficult to regulate the dosage of ozone.
China Water & Wastewater Vol. 25(2009), p. 69-71 [4] Y.L.
China Water & Wastewater Vol. 21(2005), p. 28-31 [5]J.Y.
Water Research Vol. 37(2003), p.1469-1487 [7] C.
Online since: January 2014
Authors: Fei Meng, Jia Sheng Zhang, Xiong Shi, Guo Dong Deng
The compressive load was executed at a constant displacement rate of about 0.5mm/min which wouldn’t induce obvious excess pore water pressure. 3.
Maximum dry density is similar, while the optimum water content for the filler of the bottom layer is less than that of the underlying embankment
References [1] The Professional Standards Compilation Group of People’s Republic of China.
[2] The Professional Standards Compilation Group of People’s Republic of China.
Large-scale test study on volumetric strain law of coarse-grain soil[J].Water Resources and Hydropower Engineering,2013,44(6).
Online since: December 2013
Authors: B.I. Hamisu
Samples of water were collected and examined.
Literature Review Kingsley reported that mostly any natural water that can be drunk and has no pronounced taste or odour can be used as water for mixing and making concrete and further said some water which may not be suitable for drinking may still be safe for mixing concrete.
Generally, concentrations of these salts up to 500 ppm can be tolerated in mixing water.
Sulfate Concern over a high sulfate content in mix water is due to possible expansive reactions and deterioration by sulfate attack, especially in areas where the concrete will be exposed to high sulfate soils or water.
Although mixing waters containing 10,000 ppm of sodium sulfate have been used satisfactorily.
Online since: September 2012
Authors: Jiang Yuan Hou, Shao Qing Zhang, Zhen Yu Xia
It is the common type of the professional trace playground, but it highly cost.
It’s easy to clean after pollution and high overall, water-repellent, a certain chemical resistance.
By using this material into the sports ground surface, fundamentally, can effectively resolve the shortages of sports ground material in the professional performance, environmental-friendly construction, useful time, maintenance overhaul etc.
Professional performance: It has unique double deck, good cushioning and rebound resilience, so it not only make the athletes do fast motion, but also relieve wallop at the volley, providing safe sports ground to the athletes and is the first-choice materials of professional court.
Environmental protection performance: The firming agent of this material is made of water, without toxic component such as Benzene, free isocyanate, aldehydes etc.
Online since: October 2013
Authors: Jian Ping Shu, Shi Ping Fu, Xiao Yuan Wen
With rock climbing base construction experience of the experts and local tourism departments, mountain guide professional interviews, ask the opinion of savage mountain peak climbing base construction and the suggestion, finally combined with related literature put forward the overall plan for the construction of the compound.
The biggest characteristic is the granite peak circuit, high altitude big wall, most of the climbing difficulty coefficient is larger, the top should be professional, and very high talent and a lot of hard training to achieve.
Savage peak as the limit of climbing has greater visibility, Since the project prophase is mainly aimed at professionals here to climb the top, so the scenic spot design should be integrated into the non-professional backpack gens rock climbing experience, individual, At the same time also give full consideration to the personalized, fashionable change features of content.
Stream is the source of the top of the mountain of snow melt water, edible.
Second, the terrain is flat and level, and the advantage of local materials, wood can be directly used in the construction of cabin access around the trees, water can be directly used in the camp beside the flowing stream.
Online since: February 2014
Authors: Song Yin Yan, Hui Yuan Jiang, Tu Qiang Zhou
Additionally, an utility evaluation on risk control measures of Guangxi coastal waters has been carried on, and the best three measures with highest utility value have been given. 1.
Case study Guangxi province, as the object of study in this paper, is a dense waterway net region with various waters forms.
With the geographical advantage, Guangxi coastal waters transportation has a huge potential. 3.1 Risk control measures on Guangxi coastal waters As already introduced, this paper uses a way of AHP in risk control measures.
Meanwhile, lots of overseas and domestic researches and practice achievements are widely invested in order to conduct analogy analysis with Guangxi coastal waters’ specific circumstance.
This paper aims to present reasonable and practical risk control measures on Guangxi coastal waters with two steps: risk control measures and optimization and of risk control measures, the former uses a way of Analytical Hierarchy Process, and the latter uses utility evaluation and finally specific risk control measures has been form and evaluated.
Showing 641 to 650 of 3723 items