Sort by:
Publication Type:
Open access:
Publication Date:
Periodicals:
Search results
Online since: October 2012
Authors: Rui Yang
Therefore, the utilization rate of global energy can be improved greatly if the professional heating systems could be equipped in civil buildings where people live.
Only the professional quality, practice skills, and design standards of design personnel can be improved in an all-round way, a scientific and practical heating design plan can be ensured for civil buildings.
The commonly used heating technologies can be concluded as follows: (1) co-generation of heat and power, which is a comprehensive energy utilization technology using the low-grade heat energy for heating after using the high-grade heat energy of fuel to generate power; (2) concentration heating of small and medium regional boiler rooms, which provide heats for buildings with hot water cycle in coal-burning, gas-burning, oil-burning ways and via regional pipe network; (3) small gas water heater, which is a economical and practical heating solution if the natural gas can be selected as heating fuel material in the newly-built civil buildings; (4) direct electric heating, which is a technology applying all kinds of electric radiator and film indoor, allowing the home owners to make an adjustment flexibly according to the specific requirements of the home owners and possessing a 100% heat utilization rate in end device.
Only the professional quality, practice skills, and design standards of design personnel can be improved in an all-round way, a scientific and practical heating design plan can be ensured for civil buildings.
The commonly used heating technologies can be concluded as follows: (1) co-generation of heat and power, which is a comprehensive energy utilization technology using the low-grade heat energy for heating after using the high-grade heat energy of fuel to generate power; (2) concentration heating of small and medium regional boiler rooms, which provide heats for buildings with hot water cycle in coal-burning, gas-burning, oil-burning ways and via regional pipe network; (3) small gas water heater, which is a economical and practical heating solution if the natural gas can be selected as heating fuel material in the newly-built civil buildings; (4) direct electric heating, which is a technology applying all kinds of electric radiator and film indoor, allowing the home owners to make an adjustment flexibly according to the specific requirements of the home owners and possessing a 100% heat utilization rate in end device.
Online since: April 2014
Authors: Jing Yang, Shun Liang Chen
the results are consistent with the professional safety inspection results, prove the feasibility of dynamic fuzzy comprehensive evaluation model.
Conclusion This paper develops the fuzzy comprehensive evaluation dynamic model of bridge construction safety management status, combine it with a highway bridge construction safety management, the results are consistent with the professional safety inspection results, prove the feasibility and reasonability of this model.
Theory and Model of Engineering Variable Fuzzy Set-mathematical Basis for Fuzzy Hydrology and Water Resources[J].Journal of Dalian University,2005,45(2):308-312 [3] LI Ming,CHEN Hong-kai.
Research and Application of Model Based on Set Pair Analysis and Fuzzy Set Theory for Evaluation of Water Eutrophication[J].
Conclusion This paper develops the fuzzy comprehensive evaluation dynamic model of bridge construction safety management status, combine it with a highway bridge construction safety management, the results are consistent with the professional safety inspection results, prove the feasibility and reasonability of this model.
Theory and Model of Engineering Variable Fuzzy Set-mathematical Basis for Fuzzy Hydrology and Water Resources[J].Journal of Dalian University,2005,45(2):308-312 [3] LI Ming,CHEN Hong-kai.
Research and Application of Model Based on Set Pair Analysis and Fuzzy Set Theory for Evaluation of Water Eutrophication[J].
Online since: December 2014
Authors: Xiao Xiang
At the same time, the initial conditions of construction and matters requiring attention during the construction phase are integrated and discussed, as well as issues such as the weights of design value, as a whole to consider, to minimize the error between the design and construction.
1 Introduction
Energy-saving construction is the construction mode with the target of utilizing resources reasonably and recycled, conserving resources and reducing energy consumption for construction, which means during the process of construction, each part like the planning, design, construction, maintenance and other need to save energy such as water and electric to the maximum degree, and effectively increasing energy usage, reducing energy loss [1-3].
In addition, the progress of the construction need to be deployed scientifically, reducing the consumption of green areas in the water, which is an energy-saving construction method. 3 Conclusion At this stage, energy conservation and environmental protection and low-carbon energy consumption are the inevitable trend of the development of construction project, which needs related professionals in their work continued make reform and innovation, and integrate advanced science and technology, and make improved so as to achieve suitable for the construction.
In addition, the progress of the construction need to be deployed scientifically, reducing the consumption of green areas in the water, which is an energy-saving construction method. 3 Conclusion At this stage, energy conservation and environmental protection and low-carbon energy consumption are the inevitable trend of the development of construction project, which needs related professionals in their work continued make reform and innovation, and integrate advanced science and technology, and make improved so as to achieve suitable for the construction.
Online since: November 2003
Authors: Hong Dae Shin, Hyun Ku Joo
This can explain why system with photocatalyst suspended in water or fluidized in air has
shown the higher efficiency than immobilized one.
Besides, relatively poor initial design even worsened its performance so that some environmental professionals concluded that photocatalytic system had inherent disadvantages.
As a pretreatment step, dipping POF in acetone, followed by washing off remained residue with distilled water was conducted.
TiO2 suspension (5 wt%, pH 4.5) in purified water (Milli-Q, 18M� ) was prepared and dispersed sonically.
This reactor is with both solar concentrator to increase light intensity and water filter to prevent POF from melting (light guided reactor in Fig. 4).
Besides, relatively poor initial design even worsened its performance so that some environmental professionals concluded that photocatalytic system had inherent disadvantages.
As a pretreatment step, dipping POF in acetone, followed by washing off remained residue with distilled water was conducted.
TiO2 suspension (5 wt%, pH 4.5) in purified water (Milli-Q, 18M� ) was prepared and dispersed sonically.
This reactor is with both solar concentrator to increase light intensity and water filter to prevent POF from melting (light guided reactor in Fig. 4).
Online since: May 2011
Authors: Gui Yuan Li, Zhong Yuan Duan, Fei Fei Yu, Jing Chen
Mountains, plains and hills make up a pattern of 70% mountains, 10%water and 20% arable land.
Yichang is rich in mineral and water resources, famous for its Three Gorges Dam, Gezhouba and other large water conservancy projects, and it is also rich in forest, tea, specialty fruit, chestnut, walnut, edible mushroom and other agricultural products.
As a provincial deputy city, Yichang is a hub of traffic, water transportation, logistics and economic development of western Hubei and eastern Sichuan.
At present time, industry is mainly on technology-intensive enterprises such as water conservancy and chemicals.
Lastly, shortage of professional technical city planner and the confined power on local planning personnel and fiscal department restricts the urbanization development in Yichang.
Yichang is rich in mineral and water resources, famous for its Three Gorges Dam, Gezhouba and other large water conservancy projects, and it is also rich in forest, tea, specialty fruit, chestnut, walnut, edible mushroom and other agricultural products.
As a provincial deputy city, Yichang is a hub of traffic, water transportation, logistics and economic development of western Hubei and eastern Sichuan.
At present time, industry is mainly on technology-intensive enterprises such as water conservancy and chemicals.
Lastly, shortage of professional technical city planner and the confined power on local planning personnel and fiscal department restricts the urbanization development in Yichang.
Online since: June 2014
Authors: Wei Pu Xu, Yi Ting Liu, Chao Wang, Qian Li
Currently, there is no suitable product manufacturing standards and professional test equipments abroad.
(2) Taking into account the influence of the water at low temperatures on product performance, it is advisable to increase a length of coil tube before products, which are put in the liquid nitrogen tank to carry on with condensation.
It can filter out possible water, and reduce the influence of the test results; (3) Since the direct relationship between low temperature inner leakage and closure torque, the records are needed for precise measurements of closure torque size; (4) Taking into account the actual operational condition of low temperature cylinder valves, it is advisable to install control values into Dewar vessel, which can really simulate the actual condition of control values when doing the fatigue performance test of products. 4.
Conclusion By researching systematically the use performance needs and safety indexes of globe valves and control valves in thermal insulation cryogenic gas cylinder, finally professional test equipment was developed.
(2) Taking into account the influence of the water at low temperatures on product performance, it is advisable to increase a length of coil tube before products, which are put in the liquid nitrogen tank to carry on with condensation.
It can filter out possible water, and reduce the influence of the test results; (3) Since the direct relationship between low temperature inner leakage and closure torque, the records are needed for precise measurements of closure torque size; (4) Taking into account the actual operational condition of low temperature cylinder valves, it is advisable to install control values into Dewar vessel, which can really simulate the actual condition of control values when doing the fatigue performance test of products. 4.
Conclusion By researching systematically the use performance needs and safety indexes of globe valves and control valves in thermal insulation cryogenic gas cylinder, finally professional test equipment was developed.
Online since: September 2013
Authors: Shan Hua, Xue Li Wang, Gang Han
During the operating process, it would establish professional pollution control companies which be provided technical expertise by research organization.
Include the following content mainly: First, constructing automatic water quality monitoring network in the energy and chemical industry base in northern shaanxi,especially the Yellow River in northern shaanxi.
Third, it is necessary to establish an efficient, professional and reliable environment monitoring network in the base, including drinking water, groundwater, soil, vegetation, poisonous and harmful pollutants, solid waste, etc.
Include the following content mainly: First, constructing automatic water quality monitoring network in the energy and chemical industry base in northern shaanxi,especially the Yellow River in northern shaanxi.
Third, it is necessary to establish an efficient, professional and reliable environment monitoring network in the base, including drinking water, groundwater, soil, vegetation, poisonous and harmful pollutants, solid waste, etc.
Online since: August 2012
Authors: Wei Gao, Zhong Min Liu, Jing Ji
But considering applying the prestressed reinforcement, the plate thickness change little, and prestressed is completed by professional team.
Acknowledgements The study described in this paper was supported by Heilongjiang province higher education teaching reform project: Research and practice on school-enterprise cooperation of strengthening the accounting professional through the simulation laboratory construction and the Heilongjiang Provincial Department of Education Science and technology research project (project number: 12511022).
(China Water Power Press, China 2004) [4] Wenhua Hao: ANSYS Civil Engineering Application Examples.
(China Water Power Press, China 2005) [5] GB50009-2001: Architectural structure load standards. ( China Building Industry Press, China 2002) [6] Jing Ji and Wenfu Zhang: J. of Harbin Institute of Tech.
Acknowledgements The study described in this paper was supported by Heilongjiang province higher education teaching reform project: Research and practice on school-enterprise cooperation of strengthening the accounting professional through the simulation laboratory construction and the Heilongjiang Provincial Department of Education Science and technology research project (project number: 12511022).
(China Water Power Press, China 2004) [4] Wenhua Hao: ANSYS Civil Engineering Application Examples.
(China Water Power Press, China 2005) [5] GB50009-2001: Architectural structure load standards. ( China Building Industry Press, China 2002) [6] Jing Ji and Wenfu Zhang: J. of Harbin Institute of Tech.
Online since: September 2014
Authors: Yu Qi Kan, Shao Jun Zhang, Da Peng Huang
Standards and specifications requirement for the NI mechanical parts material
At present, amount the nuclear power plant, including the operating , construction and proposed ones, besides the dominant pressurized water reactor(PWR), the other reactors, such as boiling water reactors, heavy water reactors, supercritical water reactor, high temperature gas cooled reactor, are also under developing.
Supercritical water reactor and high temperature gas cooled reactor adopt high temperature material and the material type adopted in the Russian reactor is according to their own specification.
In the past, the common supplier can’t supply French brand material, except the original professional manufacturers with own smelting.
For individual specifications, small quantities of nuclear material, one can find must have professional scientific research strength of small enterprises to do, on the other hand, you can also find a large iron and steel enterprises in industrial mass production, and then through the establishment of material reserve system and meet the corresponding standards of material inventory, so as to achieve a production, many times the purpose of using.
The pressurized water reactor nuclear power station nuclear island main equipment and materials and welding of [M].
Supercritical water reactor and high temperature gas cooled reactor adopt high temperature material and the material type adopted in the Russian reactor is according to their own specification.
In the past, the common supplier can’t supply French brand material, except the original professional manufacturers with own smelting.
For individual specifications, small quantities of nuclear material, one can find must have professional scientific research strength of small enterprises to do, on the other hand, you can also find a large iron and steel enterprises in industrial mass production, and then through the establishment of material reserve system and meet the corresponding standards of material inventory, so as to achieve a production, many times the purpose of using.
The pressurized water reactor nuclear power station nuclear island main equipment and materials and welding of [M].
Online since: November 2012
Authors: Dong Mei Li, Guang Jin Zhao, Yang Guo, Yan Li Xu, Yong Wei Wang
Damaged batteries pose the risk of hazardous material release and shall be recycled immediately under professional instructions.
The electrolyte is a solution of sulfuric acid (35%) and water (65%).
3) How about the influence of the spent VRLA to the air, soil and water?
The mechanism of reaction between batteries and environment, and the potential harm to the air, soil and water shall be settled.
How about the way of harmless treatment of waste gas, water and solid?
The electrolyte is a solution of sulfuric acid (35%) and water (65%).
3) How about the influence of the spent VRLA to the air, soil and water?
The mechanism of reaction between batteries and environment, and the potential harm to the air, soil and water shall be settled.
How about the way of harmless treatment of waste gas, water and solid?