Straightness of U75V 100m Heavy Rail under Deferent Straightening Processes

Article Preview

Abstract:

Temperature of the head, the waist, the bottom and angle of the bottom of same heavy rail lying on the cooling bed is tested continuously, time interval is 5min, which can provide the basis for prebending process. Additionally, the U75V 60Kg/m heavy rail straightening processes using the horizontal and edge roll compound straightening machine is discussed in this paper, and contrasts the cross-section dimension and straightness of heavy rail before and after being straightened, which is important to make certain of optimum straightening parameters.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

105-109

Citation:

Online since:

October 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] QI Bao-jin, Research on Straightness Tester of Rail[J], Measuring Technology, 2006, (8): 115. (in Chinese).

Google Scholar

[2] ZHOU Qing-yue, ZHOU Zheng-guo, LU Guan-jian, etc. Temporary Technical Specification for Rail of 250km/h 60kg/m Passenger Line[S], National Standard. 2005. (in Chinese).

Google Scholar

[3] GUO Hua, MEI Dong-sheng, WANG Yan-zhong, The Technology of Rail Compound Straightening[J], Steel Rolling, 2002, 19(5): 12. (in Chinese).

Google Scholar

[4] ZHANG Xue-bin, The Straightening Steel Rail Technique Research for the Special Passenger Transport Rail Line[J], Sichuan Metallurgy, 2008, 30(2): 24. (in Chinese).

Google Scholar