Design of a New Suspension Mechanism of Temporarily Installed Suspended Access Equipment

Article Preview

Abstract:

This paper introduces the design of suspension mechanism of a large load and big span Temporarily Installed Suspended Access Equipment (TISAE), and acquires the expression of each of component and the wire rope based on the typical equation of force method. Setting up the mathematical optimization model and writing a program search for the optimal positions of installing wire rope. Based on ANSYS analyze the general suspension organization structure and the new suspension organization. The new suspension mechanism may take larger work load.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1650-1654

Citation:

Online since:

February 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] XIE Jin-fu. Analysis and prevention for a gondola falling accident. Construction and Mechanization, 88-89 (2010. 06). In Chinese.

Google Scholar

[2] ZHANG Hua, DONG Wei, YU Hai. Several problems should be solved for aerial suspended platform development. Construction and Mechanization, 73-76 (2009. 01). In Chinese.

Google Scholar

[3] LI Lian-kun. Structural Mechanics. Higher education press, 2004. In Chinese.

Google Scholar

[4] TAN Hao-qiang. C Program Design. Tsinghua university press, 2005. In Chinese.

Google Scholar

[5] WANG Qi-wu, ZUO Fang, HU Ren-xi. ANSYS 10. 0 mechanical design senior application example. China Machine press, 2006. In Chinese.

Google Scholar

[6] GB19155-2003, Temporarily Installed Suspended Access Equipment. In Chinese.

Google Scholar