Finite Element Modeling for Health Monitoring and Condition Assessment of Large-Span Steel Roof Unloading Process

Article Preview

Abstract:

The health monitoring and diagnosis of the major engineering structure is increasingly extensive attention from all the community. In particular, for the complex large-span steel roof unloading process, it is important especially. The unloading process will cause the change of structure stiffness include the internal force redistribution. The real-time and on-line monitoring have been applied to Xining stadium of the stress in the process of unloading for the purpose of structural health assessment in the paper, so as to achieve the purpose of the early warning of the problems which may arise in construction process. At the same time, through the comparison of the finite element software ANSYS analogue simulation and the value of the actual, it is obtained for the quality problem of steel structure in the process of unloading.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1370-1374

Citation:

Online since:

May 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Jiang Jinsheng , Ye Keming . Construction Method and Dismantling Process Analysis of Temporary Shoring Structure for the Roof of Shanghai New International Expo Center[J]. Journal of Building Structures, 2006, 27( 5) : pp.118-122.

Google Scholar

[2] Wu Xiao-ping, Gao Zhenfeng , LI Zixu. The Analysis of Whole Erection Process for Steel Shell of National Gr and Theatre [J].Journal of Building Structures, 2005, 26( 5) : pp.40-45.

Google Scholar

[3] Gao Ying, Fu Xueyi,Yang Xiangbing.Whole removal process simulation of temporary support of Jinan Olympic Stadium[J]. Spatial Structures,2009,15( 1) : pp.20-34. ( in Chinese)

Google Scholar

[4] Qian Jiaru, Zhang Weijing, Zhao Zuozhou etal. Simulation and monitoring for the construction of the steel roof of the Peking University Gymnasium[J].Civil Engineering Journal, 2009, 42( 9): pp.13-20. ( in Chinese)

Google Scholar