Study on Construction Risk Analysis and Risk Counter-Measures of River-Crossing Tunnel of Large-Diameter Metro

Article Preview

Abstract:

There are numerous difficulties and risks in the construction of river-crossing tunnel of large-diameter metro. How to ensure the safety of the project and reduce the construction risk is the key issue requiring urgent solution. This paper, taking a project of constructing river-crossing tunnel of large-diameter metro as the research background, compared and selected the methods of constructing this river-crossing tunnel. Large-diameter slurry shield machine was recommended to conduct digging construction. Then, possible risks of the selected construction method were analyzed and summarized into two categories: risk concerning the project itself and environmental risk. Finally, corresponding measures to handle the risks were put forward.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2680-2683

Citation:

Online since:

May 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Gong Xiaonan, et al.2008. Foundation Treatment Handbook. Beijing: China building industry Press

Google Scholar

[2] Wang Mengshu, et al. 2010. Tunneling and Underground Engineering Technology in China. Beijing: China Communications Press

Google Scholar

[3] Zhang Fengxiang, Fu Deming, Yang Guoxiang. 2005. Construction Manual of Shield Tunnel. Beijing: China Communications Press

Google Scholar

[4] Edited by Shanghai Society of Civil Engineering & Shanghai Tunnel Engineering Co., Ltd. Large Diameter Tunnel and Urban Rail Transit Engineering Technology: Proceedings of 2005 Shanghai International Forum on Tunneling [M]. Shanghai: Tongji University Press, (2005)

DOI: 10.29252/jafm.11.01.27715

Google Scholar

[5] Hu Jun,Yang Ping, et al.Study on Numerical Simulation of Cup-shaped Horizontal Freezing Reinforcement Project near Shield Launching. International Workshop on Architecture, Civil and Environmental Engineering (ACEE 2011).2011,4

DOI: 10.1109/icetce.2011.5776395

Google Scholar

[6] Zeng Hui, Hu Jun, Yang Ping. A Numerical Simulation Study on the Chemical Reinforcement Area at Shield Start Shaft. International Workshop on Architecture, Civil and Environmental Engineering (ACEE 2011).2011,4

DOI: 10.1109/icetce.2011.5776498

Google Scholar

[7] Hu Jun, Yang Ping, Dong Chaowen, et al. 2010. Chemical Reinforcement Area at Shield Start Shaft and Its Technology Study. Railway Engineering, Vol. No. 2. pp.47-51. China.

DOI: 10.1109/icetce.2011.5776498

Google Scholar

[8] Hu Jun, Yang Ping, Dong Chaowen, et al. 2010. In-situ Investigation of Mode to Strengthen Shield Tunnel End on Suzhou Metro Line No.1. Railway Engineering, Vol. No. 11 pp.32-35. China

Google Scholar

[9] Zeng Hui, Yang Ping, Hu Jun. 2011. Case Study of Reinforcement Technology of Shield Start Shaft in Special Layer of Earth [J]. Railway Engineering, Vol. No. 2. pp.79-81. China

DOI: 10.1109/icetce.2011.5776498

Google Scholar