Research of Difference Analysis Method of Constructed Wetland - By Xiaosha River as Example

Article Preview

Abstract:

This paper taked Xiaosha River constructed wetland as the study object, the difference of the constructed wetland and Xinxue River constructed wetland as a demonstration project were studied theoretically by constructed wetland model, virtual data were constructed and amended by the difference. The application of constructed wetland differentiation during actual modeling process was studied. In the actual project, there was important guiding meaning on design, construction and operation management of the constructed wetland in this study.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1310-1313

Citation:

Online since:

May 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Shengzhong Xiao, Xinzheng Zhang., Qifeng Wu the application of neural network in wastewater treatment[J]. Statistics and Decision, 2005, 26(3): 18-21.

Google Scholar

[2] Jinsong. Guo: Based on artificial neural network (ANN) of water quality evaluation and the water quality simulation [D]. Chongqing: Chongqing University, 2002.

Google Scholar

[3] Pengjie Gao. Issues of Constructed Wetland applications, The national water pollution control, governance, ecological restoration technology, and sudden water pollution emergency handling system, seminars, exchanges compilation of papers (2007)

Google Scholar

[4] Xushi. Yan, Jinchu Fan. Water supply engineering [M] (2002)

Google Scholar