The Tunnel of Small Interval Clip Rock Mechanics Properties Research

Article Preview

Abstract:

Abstract. In jiangxi red XiaShan highway tunnel interval for engineering background, the key research different scheme for tunnel construction process between them the mechanical behavior of rock and analyzed. For small interval double hole parallel tunnel between them the complex rock stress state, the finite element analysis software for using the numerical analysis method is buried deep in the condition of small interval period of bias by different construction scheme of tunnel numerical simulation. To meshshotcreting firstly method, CD method, up and down steps method, the construction method of different displacement and deformation of the stability of surrounding rock and the comparative analysis. Analyze the different schemes of before and after the surrounding rock tunnel excavation and supporting structure composed of each other of the unity displacement change rule. Put forward the tunnel between them weak rock the concept, more explicit the engineering geological conditions of weak rock tunnel clip to control surfaces. And on the basis of guidance for engineering construction, in actual construction which has obtained a better effect. The result is of a similar project design and construction to provide the reference and the model.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1816-1819

Citation:

Online since:

May 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] ZHANG Ye-min,LI Wen-jian,LI Jin-cai.Numerical simulation of depth bias overwhelming force tunnel construction[J].Mechanics in Engineering,( 2011),V33(2): 46-51.

Google Scholar

[2] LI Wenjian,ZHANG Yemin, LI Jincai.Based on the theory of catastrophe ultra-shallow railway tunnel construction process of numerical simulation[A].3rd Int. conf. on Transportation Engineering [C],ChengDu,(2011). American Society of Civil Engineers ,Transportation Facilities, Infrastructure, and Pavements, pp.1830-1835.

DOI: 10.1061/41184(419)302

Google Scholar

[3] ZHANG Ye-min, LI Wen-jian. Application of Design and Construction with PHC Tube Pile Foundation to Complex Soft Soil Based Conditions[J]. Journal of Liaoning University of Technology(Natural Science Edition), V30(3):157-161. (2010)

Google Scholar

[4] CAI M,KAISER P K. Assessment of excavation damaged zone using a micromechanics model[J].Tunnelling and Underground Space Technology,(2005),20(4):301–310.

DOI: 10.1016/j.tust.2004.12.002

Google Scholar

[5] Zhang Yemin,Zhang Xinhua.Study of Cement-based Composite Materials on the Force Senstived Effect ,The Third International Conference on Transportation Engineering(ICTE 2011),2011(27):97-99 . ASCE ISBN:978-0-7844-1184-1

DOI: 10.1061/41184(419)320

Google Scholar

[6] ZHANG Yemin .Application of Fuzzy Mathematics and Comprehensive Assessment in Campus Architecture Safety Assessment (ICCET 2011) Jinan China. Oct.2011.190-194. ISBN:978-3-03785-245-3

DOI: 10.4028/www.scientific.net/amm.99-100.190

Google Scholar