Accuracy Control Technique of Vertically Matching the Curved Steel Tower

Article Preview

Abstract:

For solving the technical problem of accuracy control during manufacturing and vertically matching the curved steel tower of the bridge, this paper studies the accuracy control technique about it, as project example with the world’s first curved steel tower of No.3 Nanjing Yangtze River Bridge in China. Emphatically research the linear control during manufacturing and vertically matching the tower. Advance the conception of the accuracy control and build up an appropriate “Accuracy Control System” (ACS). Expound the contents of accuracy control, procedure and controlling means. Stress the research on the definition of the reference system of the tower, accumulated height error control, accumulated axis bias error control and accumulated torsion error control. Finally, in accordance with the results of accuracy control, give implement principle and method of manufacturing and vertically matching the tower. The check results show that accuracy of the control meets the design requirements and the research results are practical and reliable.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2917-2923

Citation:

Online since:

May 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Huang teng, et al .. "Linear control research of the construction of north inlet part of No.2 Nanjing Yangtze River Bridge." Geotechnical Investigation & Surveying, No.6(2003), 57-59.

Google Scholar

[2] Xiang Zhong-fu. "Construction and control techniques of the bridge." Construction and control techniques of the bridge, China Communications Press, Beijing, China(2001), 118-120.

Google Scholar

[3] Wu Dong-cai, et al.. "The construction surveying of Yangtz-river road bridge of Wuhan." Urban Geotechnical Investigation & Surveying, No.3(1995), 13-18

Google Scholar

[4] Huang Zhang-yu, Zhao Zhong-rong, etc. "The construction surveying of high tower pile in the second bridge of Nanjing."Jiangsu Surveying and Mapping, 23(1) (2000), 19-22.

Google Scholar

[5] Li Kun. "Trigonometric Leveling in Construction of SuperBridge." Journal of Changsha University of Electric Power (Natural science), No.3 (2005), 88-91.

Google Scholar

[6] Hua Xi-sheng and Huang teng. "The technique and application of precision survey." The application of precision survey technique In the projects, Hohai University Press, Nanjing, China (2002), 247-270.

Google Scholar

[7] Xia Gui-yun. "Theory of the calculation of the large-span bridge structures." Calculation of cable stayed bridge. China Communications Press, Beijing, China (2002), 75-86.

Google Scholar