Dynamic Compaction and Compaction Grouting for Dewatering in Pit

Article Preview

Abstract:

China University of Geosciences (Beijing) has developed a dynamic compaction and compaction grouting (DCCG) method for groundwater flow control in Dalian. This method has been proven effective in dramatically reducing permeability in plain fill soil, and in granular or porous media. It has been successful used in many applications dealing with deep pit by coast. This paper presents the DCCG that has particular relevance in today’s pit construction marketplace by coast. Permeability can be improved by means of the DCCG. A brief introduction to the technique is followed by discussion of recent advances, illustrated by case studies of applications

You might also be interested in these eBooks

Info:

Periodical:

Pages:

789-792

Citation:

Online since:

May 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Robert G. Lukas,Geotechnical engineering circular No.1—Dynamic Compactiom, FHWA-SA-95-037

Google Scholar

[2] Baker, W.H., Cording, E.J. and MacPherson, H.(1983). "Compaction Grouting To Control Ground Movements During Tunneling". Underground Space, Vol. 7, pp.205-212

Google Scholar

[3] Nonveiller E. Grouting in theory and practice. Amsterdam: Elsevier; (1989)

Google Scholar

[4] ShuLi Wang, ManGen Mu, JingYu Dai, Xiaohuan Hu, Foundation Numerical Analysis on Soft Soil Reinforced with Stone Columns,Applied Mechanics and Materials Vols. 94-96 (2011)pp.190-195

DOI: 10.4028/www.scientific.net/amm.94-96.190

Google Scholar

[5] DaLian academy of reconnaissance and mapping co.ltd, East harbor Engineering exploration, (2009)

Google Scholar

[6] ShuLi Wang,DunWu Chen, Ran Wang, Numerical analysis of the second composite ground, Advanced Materials Research Vols. 347-353 (2012) pp.725-732

DOI: 10.4028/www.scientific.net/amr.347-353.725

Google Scholar