The Application of Riprapping for Sludge Extrusion in Foundation Treatment in Reclamation and Sludge Areas

Article Preview

Abstract:

This paper firstly expounds the scope and principle of riprapping for sludge extrusion, and then details of quality control standard of the construction technology and process are described according to the engineering practice. The points of subsidence, surrounding upheaval, deep horizontal displacement, and pore water pressure are also monitored respectively set in hydraulic fill mud area. The monitoring data are analyzed for conclusion to explore the feasibility and existing problems of riprapping for sludge extrusion in this experiment.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

853-856

Citation:

Online since:

May 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] LI Ping, CHEN Li—qun.Application of Stone Fling Mud—Extracted in Soft Base Process [J].Journal of Xiangtan Normal University: Natural Science Edition, 2009, 31 (2) :103—106. ( in Chinese)

Google Scholar

[2] ZHOU Sheng, ZHANG Wei, LI Ping. Application of Stone-Fling Mud-Extracted in Soft Base Reinforcing Process [D].Shanxi Architecture, 2007, 33 (28) :118-119. (in Chinese)

Google Scholar

[3] WANG Dong-sheng.The Application and Analysis of Riprapping for Sludge Extrusion in Treatment for Soft Foundation [J].Ground improvement, 2003, 14 (1) :31-39. (in Chinese)

Google Scholar

[4] FANG Mang.Analysis of Riprapping for Sludge Extrusion in Treatment for Some Key Problems [J].Chinese High—Tech Enterprise, 2008 (13) :171. (in Chinese)

Google Scholar