Causes of Delay in Indian Construction Industry

Article Preview

Abstract:

Delays in a construction project can be regarded as a failure. This paper aims to investigate the causes of delay in Indian construction projects undertaken by private, government and nongovernmental organizations. In view of this 45 causes of delay were identified and developed the questionnaire for the quantitative confirmation of the most causes of delay. Consequently the questionnaire was distributed to construction professionals like Managers, Engineers and others. Subsequently the collected data was analyzed using statistical tool and the factors were measured and ranked under each group by importance index for various construction professionals. The results suggest that delays are mainly due to shortage of labours, shortage of construction materials and extra works (rework and change orders). The resources like manpower and materials are having highest contribution of about 24% compared to other sources. However this paper presents recommendations for a better project management techniques & procedures which can be adopted during conceptual & detailed planning phases of the project in order to minimize the construction delay.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2768-2773

Citation:

Online since:

May 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Abdalla M. Odeh & Hussien T. Battaineh,'Causes of construction delay: traditional contracts', International journal of Project Management, Vol 20 (2002), pp.67-73.

DOI: 10.1016/s0263-7863(00)00037-5

Google Scholar

[2] Abd El-Razek M.E., Bassioni .H.A.and Mobarak A.M., 'Causes of delay in building construction Projects in Egypt', Journal of Construction Engineering and Management, Vol 134 (2008), No. 11, p. (831-841).

DOI: 10.1061/(asce)0733-9364(2008)134:11(831)

Google Scholar

[3] Daniel W M Chan and Mohan M Kumaraswamy. (1997), 'A comparative study of causes of time overruns in Hong Kong construction projects', International Journal of Project Management , Vol. 15, No. 1, pp.55-63.

DOI: 10.1016/s0263-7863(96)00039-7

Google Scholar

[4] Nirmal Kumar Acharya, Young Dai Lee, Soo Yong Kim and Jong Chool Lee, 'Analysis of Construction Delay Factor: A Korean Perspective', Proceeding of the 7th Asia Pacific Industrial Engineering and management Systems conference, 17-20 December (2006), Bangkok, Thailand

Google Scholar

[5] Sadi A.Assaf and Sadiq Al-Hejji.,'Causes of delay in large construction projects' in Saudi Arabia, International journal of Project Management, Vol24 (2006), pp.348-357.

DOI: 10.1016/j.ijproman.2005.11.010

Google Scholar