Research on Highway Pre-Compression Term on Alluvial Flat Soft Clay Treated with Packed Drain Well

Article Preview

Abstract:

The joint road of Jiaozuo-Gongyi Yellow River bridge in Henan province is built on the Yiluo River alluvial flat soft ground. The total length treated with packed drain well is 1384 meters. To guarantee project quality and summarize the deformation rules of the alluvial flat soft clay, 15 representative sections are selected and 38 settlement plats are set. The observation has been lasting more than two years from construction to precompression term. By analyzing the characteristic of the soft clay, the settlement type of precompression, the settlement standard of post-construction and the settlement rate of precompression, that the precompression term is not needed is put forward on the alluvial flat soft ground treated with packed drain well.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1230-1233

Citation:

Online since:

May 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] E.W. Brand, R.P. Brenner: Soft clay engineering (Elsevier Scientific Publishing Company, 1981, Amsterdam)

Google Scholar

[2] Ministry of communications of the People's Republic of China: Technical Specifications for Design and Construction of Highway Embankment on Soft Ground(China Communications Press, 1996)

Google Scholar