Analysis on Post-Construction Settlement of Pile Group Foundation and Load Monitoring for Dazhangcun Grand Bridge
Abstract:
Combining with the construction of Dazhangcun Grand Bridge of Datong-Xian passenger dedicated railway line, typical pile foundations’ axial load of steel bars and settlement of foundation was monitored and analyzed. At the same time, some meaningful conclusion which were reference and guiding significance for design and construction of the similar project in collapsed loess district were drawn.