p.2183
p.2187
p.2192
p.2199
p.2204
p.2209
p.2213
p.2219
p.2224
Analysis of Temperature Effect on Cable-Stayed Bridge at Construction Stage Corrected
Abstract:
Temperature in the concrete box girder caused by sunshine has a significant influence on the deflection, stress and strain of the beam. Based on the Xinjiang Bridge, through measuring the deflection, temperature, stress and strain at the largest cantilever stage,then compare the measured results with finite element analysis results to investigate the impact of temperature gradient on the construction of cable-stayed bridge.
Info:
Periodical:
Pages:
2204-2208
Citation:
Online since:
May 2012
Authors:
Price:
Сopyright:
© 2012 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: