Maintenance Strategies of Historical Bridges in China

Article Preview

Abstract:

In China a large number of bridges built in 1960s and 1970s are still in operation. They went through several decades of intense heat and cold winter, water scouring, and accelerated load-increasing, which will lead to the deterioration of the structure. They are in the need of maintenance, reinforcement and transformation. The bridge assessment, maintenance, reinforcement and strengthening for the safety and reliability of existing bridges had attracted the attention of researchers. It’s essential to reinforce the old bridges with appropriate designs and construction technologies to improve its load-carrying capacity and extend the service life to meet the requirements of the current transportation. This paper first introduced China’s current situation and existing problems of the bridges. Then the strengthening methods and techniques for the existing damaged bridges are presented. The conclusions and future prospects are finally given.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2264-2267

Citation:

Online since:

May 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Information on http://www.moc.gov.cn/06jiaotonggk/zongjiegb/index_1.html

Google Scholar

[2] Information on http://www.chinahighway.com

Google Scholar

[3] Information on http://www.zgjtb.com

Google Scholar

[4] Li, Y.F. and Lin, A.Y.: Inspection, assessment and maintenance of bridges (China Machine Press, China 2003).

Google Scholar