Improved Design of Long Tunnel’s Cement Concrete Pavement Slab Length

Article Preview

Abstract:

Temperature field on the road inside the tunnel has a significant difference with normal road surface temperature field, according to the actual situation of the temperature inside the tunnel, calculate the slab length of the cement concrete pavement, obtained the conclusion that cement concrete road slab can be longer inside the tunnel, the conclusion has practical significance for the construction of cement concrete pavement inside the tunnel.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

496-499

Citation:

Online since:

July 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Angelo Caratelli, Alberto Meda, Zila Rinaldi. Structural behavior of precast tunnel segments in fiber reinforced concrete. Tunnelling and Underground Space Technology, 2011, 26: 284–291.

DOI: 10.1016/j.tust.2010.10.003

Google Scholar

[2] CCCC Highway Consultants CO., Ltd. Specifications for Design of Highway Cement Concrete Pavement. China Communication Press, 2011, 12.

Google Scholar

[3] Takashi Tomoto, Akihiro Moriyoshi, Kiyoshi Sakai. Identification of the sources of organic compounds that decalcify cement concrete and generate alcohols and ammonia gases. Building and Environment, 2009, 44: 2000–(2005).

DOI: 10.1016/j.buildenv.2008.12.011

Google Scholar

[4] Olivier Bernard, Franz-Josef Ulm, Eric Lemarchand. A multiscale micromechanics-hydration model for the early-age elastic properties of cement-based materials. Cement and Concrete Research, 2003, 33: 1293–1309.

DOI: 10.1016/s0008-8846(03)00039-5

Google Scholar

[5] LIU Jin-lai, YU Jin-jiang, JIN Tao. Influence of temperature on tensile behavior and deformation mechanism of Re-containing single crystal superalloy. Transactions of Nonferrous Metals Society of China, 2011, 21: 1518-1523.

DOI: 10.1016/s1003-6326(11)60890-x

Google Scholar

[6] Burgers R, Walraven J, Plizzari G. A, Tiberti G. Structural behaviour of SFRCtunnel segments during TBM operations. In: World Tunnel Congress ITA-AITES 2007, Praga, p.1461–1467.

Google Scholar