Drainaging Technology for Construction Subgrade in the Shallow Groundwater Area

Article Preview

Abstract:

In order to solve subgrade problems during the road construction in the shallow ground water area, light well point drainage technology is used, combined with the zhengbian logistics road. This paper expounds application principle of the light well point drainage, calculation and construction methods. When using light well point drainage, the appropriate permeability coefficient is 4 m/d relatively. If using water rushed law construction, water pressure should be controlled in 0.3-0.7 MPa. After well point equipment operates for 3-5 days, the foundation will form the precipitation funnel; then, soil can be excavated after drainaging 7-8d. It is shown that the light well point drainaging can reduce underground water lefficiently.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1152-1155

Citation:

Online since:

August 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Y.Q Yuan, X.C. Wang:Chinese Journal of Geotechnical Engineering, Vol.29(3)(2007), p.361.

Google Scholar

[2] J.L. Wang:Communications Standardization, Vol.20 (1)(2007) , p.163.

Google Scholar

[3] Y. Guo: Soie Engineering and Foundation, Vol.22(2)( 2002),p.7.

Google Scholar

[4] Z.M. Cao, R.S. Huang, F. Zhang:Highway traffic technology, Vol.6 (2)(2010),p.57.

Google Scholar

[5] Y.X. Li, J. Jiang:Building Construction, Vol.32(2)(2010),p.128.

Google Scholar