Research on Advanced Geological Prediction in Highway Double-Arch Tunnel Construction

Article Preview

Abstract:

In this paper, a comprehensive advanced geological prediction method in highway double-arch tunnel construction was put forward, which could take the advantages of geological radar technology and the horizontal of advanced drilling in karst area. The method would give relatively accurate judgments in the construction of the highway double-arch tunnel by using different geological radar survey line layout, combining with advanced horizontal hole, which ensure the construction safety of the tunnel. The practical application of comprehensive advanced geological prediction in double-arch highway tunnel in karst area had received a good effect, and it showed the method had a certain guiding function.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

805-809

Citation:

Online since:

August 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] WANG Suo, ZHAO Mingjie, LIN Zhi, Summary of Common Geologic Hazards during Highway Tunnel Construction, J. Technology of Highway and Transport, (2009) 102-106.

Google Scholar

[2] LUO Li-rui, LIU Zhi-gang, YAN Yi-chong, The concept and development of geological prediction system, J. Rock and Soil Mechanics, 32(2011)614-618.

Google Scholar

[3] LI Shucai, LIU Bin, LI Shuchen, etc, STUDY OF ADVANCED DETECTION FOR TUNNEL WATER-BEARING GEOLOGICAL STRUCTURES WITH INDUCED POLARIZATION METHOD, J. 30 (2011)1297-1309.

Google Scholar

[4] SHI Shao-shuai, LI Shu-cai, LI Li-ping, etc, Comprehensive geological prediction and management of underground river in karst areas , J. Rock and Soil Mechanics, 33(2012)227-233.

Google Scholar

[5] Bo hui-shen, Practical handbook of ground penetrating radar technology, first ed., Geological Publishing House, Beijing, (2006).

Google Scholar

[6] YANG Tianchun, ZHOU Yong, LI Hao, USE AND ANALYSIS OF GROUND PENETRATION RADAR FOR FORCASTING GEOLOGICAL CONDITIONS IN HIGHWAY TUNNELING, J. Journal of Engineering Geology, 18(2010)971-975.

Google Scholar

[7] Lu Lixun, Deng Shikun, Ran Mi, The Application of GPR in the Advanced Detection for Tunnel Excavating, J. Chinese Journal of Engineering Geophysics, 7(2010)201-206.

Google Scholar

[8] Zhou Bailin, Applications of Long Shot Hole Method in Comprehensive Advanced Prediction for Geological Conditions of Complex-Karst Tunnels, J. Railway Investigation and Surveying, (2010)22-24.

Google Scholar

[9] Yu Shigen, Ding Jingze, Xing Baoguo, Application of Integrated Geological Prediction Technology in Tunnel, J. Chinese Journal of Engineering Geophysics. 7(2010)495-499.

Google Scholar

[10] Ren Shangqiang, Discussion on Construction Method for Double-arched Six-Lane Tunnel with Combined Central Wall, J. Chinese Journal of Underground Space and Engineering. 6(2010)354-357.

Google Scholar