Application of Ballastless Track CP III Control Network Measure Method in the Building of High Speed Railway

Article Preview

Abstract:

In the process of building the ballastless track of the high speed railway from Wuhan to Guangzhou, the measuring method of the CPⅢ control network has played an extremely critical role. In this article, the form layout, measuring method, precision requirements and some other contents of the high speed railway ballastless track CP Ⅲ have been proposed. It has been proved that this control network has reliable technology basis and meets the construction requirements, which is available for other similar engineering.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1817-1821

Citation:

Online since:

October 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] L.Qiang: Railway Investigation and Surveying.Vol.1(2011),P.1(In Chinese).

Google Scholar

[2] H.Yadong,Z.Jianzheng and S.Qingjuan: Journal of Railway Engineering Society.Vol.11(2010),P.38 (In Chinese).

Google Scholar

[3] L.Daoyuan: Tunnel Construction.Vol.29(2009),P.239 (In Chinese).

Google Scholar

[4] L.Jianping,L.Qianwen and H.Xiaojun: Journal of Railway Science and gineering.Vol.7.(2010),P.16 (In Chinese).

Google Scholar