[1]
Dengfeng Yan, Jian Ye, Maoman Chen, et al. Pump efficiency and conversion methods for efficiency [J]. Drainage and Irrigation Machinery, 2007, 25(1): 1-8. (in Chinese)
Google Scholar
[2]
Fang Cheng, Shoulun Chen. Decomposition-coordination model for optimal operation of pumping stations [J]. Journal of Hehai University (Natural Sciences ), 2003, 31(2): 136-139. (in Chinese)
Google Scholar
[3]
Yanming Hu. Using peak-valley electricity price of power network to realize economic operationof pumping station[J]. Automation of Hydropower Plants, 2004, (2): 97-100. (in Chinese)
Google Scholar
[4]
Jilin Cheng, Lihua Zhang, Rentian Zhang, et al. Study on optimal daily operation of single adjustable-blade pump unit in pumping station [J]. Journal of Hydraulic Engineering, 2010, 41(4): 499-504. (in Chinese)
Google Scholar
[5]
Yi Gong, Jilin Cheng, Rentian Zhang, et al. Algorithm of daily operation scheme for parallel pumping stations [J]. Journal of Drainage and Irrigation Machinery Engineering, 2011, 29(3): 230-235. (in Chinese)
Google Scholar
[6]
Edson da C.B., Roberto A. de A., Augusto N.C.V.. Optimization of parallel variable-speed-driven centrifugal pumps operation [J]. Energy efficiency, 2008, 1(3): 167-173.
DOI: 10.1007/s12053-008-9010-1
Google Scholar
[7]
Abdelsalam, N.M., Aziz, M.S., Zobaa, A.F., et al. Optimizing operation at the Mubarak pumping station in Egypt[J]. International Journal on Hydropower and Dams, 2010, 17(6): 87-91.
Google Scholar
[8]
Chad Wegley, Muzaffar Eusuff, Kevin Lansey. Determining pump operations using particle swarm optimization [J]. Joint Conference on Water Resource Engineering and Water Resources Planning and Management, 2004(104): 1-6.
DOI: 10.1061/40517(2000)206
Google Scholar