Prediction of the Maximum Riverbed Erosion Depth nearby the River-Crossing Tunnel in Nanchang Reach of Ganjiang River

Article Preview

Abstract:

Nanchang rail transit project line1 was programmed to drill through the Ganjiang river bottom of the reach approximately 700m downstream from the Nanchang Bridge. The prediction of maximum erosion depth of the river bed at the tunnel location was strongly needed. This paper described the composition and evolution of the river bed in the engineering reach, established a 2-D flow and sediment mathematical model to calculate and analyze the river bed evolution at the tunnel location, selected the typical hydrological years of erosion calculation, catastrophic floods and a long series of hydrological years as the hydrological conditions, and finally obtained the maximum erosion depth under different hydrological conditions. These results will provide technical reference for the tunnel design.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

130-136

Citation:

Online since:

October 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Ying-biao Shi, Hai-yan Lu, Yuan-ping Yang and Ying Cao: Advances in Water Science (2008), Vol. 19(5), p.685. (In Chinese).

Google Scholar

[2] Tian-le Dong, Ying-biao Shi, Hai-yan Lu and Yuan-ping Yang: Rural Water and Hydropower in China (2008), Vol. 7, p.56. (In Chinese).

Google Scholar

[3] Fang Yang and Yong He: PEARL RIVER (2010), Vol. 2, p.14. (In Chinese).

Google Scholar

[4] Wei Zhang, Yitian Li and Jing Yuan: Journal of Hydroelectric Engineering (2011), Vol. 30(4), p.90. (In Chinese).

Google Scholar

[5] Junqiang Hu, Qidong Xiong and Pinxiang He: Road and Bridge Engineering of Chongqing Architecture (2010), Vol. 9(11), p.6. (In Chinese).

Google Scholar