Power System with Wind Power Connection Anti-Peak Regulation Ability Analysis

Article Preview

Abstract:

In the condition of large scale wind power connection, the uncertain of the wind power output takes great challenge to the peak regulation. In this paper for some wind power connection system, the influence of wind power connection to the peak regulation was studied by analyzing the system load and the historical real data after the wind power connection. The computation model which evaluates the normal units’ anti- peak adjusting capability was built and the multiply integer program algorithm was used to solve this model. A real case was used to test the exactness and feasibility of the computation model.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

417-422

Citation:

Online since:

November 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Chen B S, Hu H L. (2008) General situation and prospect of wind power in China. Power System Technology, 32(2): 272-275.

Google Scholar

[2] Lei Y Z. (2003) Studies on wind farm integration into power system. Automation of Electric Power Systems 27(8): 84-89.

Google Scholar

[3] Ronan D, Mark O. (2004) A new approach to quantify reserve demand in systems with significant installed wind capacity. IEEE Trans on Power Systems 20(2): 587-595.

DOI: 10.1109/tpwrs.2005.846206

Google Scholar

[4] Holttinen H. (2004) The impact of large scale wind farm integration in Nordic countries. Espoo, Finland: Helsinki University.

Google Scholar

[5] Han X Q, Sun S G, Qi Q R. (2010) Evaluation of wind power penetration limit from peak regulation. ELECTRIC POWER 43(6): 16-18.

Google Scholar

[6] Wang Z M, Sun A L, Lu S. (2010) Analysis on capacity of wind power integrated into liaoning power grid based on power balance. Automation of Electric Power Systems, 34(3): 86-89.

Google Scholar

[7] Sun R F, Zhang T, Liang J. (2011) Evaluation and application of wind power integration capacity in power grid. Automation of Electric Power Systems 35(4): 70-75.

Google Scholar

[8] Zhang N, Zhou T R, Duan C G, et al. (2010) Impact of large-scale wind farm connecting with power grid on peak load regulation demand. Power System Technology 34(1): 152-158.

Google Scholar

[9] Zhang H Y, Yin Y H, Shen H, et al. (2011) Peak-load regulating adequacy evaluation associated with large-scale wind power integration. Proceedings of the CSEE 31(22): 26-31.

Google Scholar

[10] Yi L D, Zhu M Y, Wei L, et al. (2010) A computing method for peak load regulation ability of Northwest China power grid connected with large-scale wind farms. Power System Technology 34(2): 129-132.

Google Scholar

[11] Wang C. X, Zhang Y. (2003) Wind power generation. Beijing: China Power Publishing Company.

Google Scholar

[12] Yang H, Liu J X, Yuan J S. (2010) Research of peak load regulation of conventional generators in wind power grid. Proceedings of the CSEE 30(16): 26-31.

Google Scholar

[13] Chen J F, Chen H Y, Duan X Z. (2006) Multi-period dynamic optimal power flow in wind power integrated system. Proceedings of the CSEE 26(3): 31-35.

Google Scholar