The Application of GPS for High Rise Building Deformation Monitoring During the Servicing Stage

Article Preview

Abstract:

With the development of the city, there has more and more high rise buildings, people has serious attention on the security problems of the high rise buildings. Code for deformation measurement of building and structure asks that, deformation monitoring for high-rise building during service stage is necessary. During servicing stage of the high-rise building, owing to the change of site conditions, it is difficult to use former monitoring way. GPS plays a incomparable role in the deformation monitoring during the servicing stage for its advantages of high precision, fast speed and easy operation. This paper introduces the monitoring way and data processing of using GPS for high-rise building during servicing stage, using a example to prove that the application of GPS in deformation monitoring for high-rise building during servicing stage is feasible.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2115-2119

Citation:

Online since:

November 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Ministry of construction of the People's Republic of China. Code for deformation measurement of building and structure(JGJ 8-2007). (China Planning Press, China, 2007).

Google Scholar

[2] Ministry of construction of the People's Republic of China. Code for engineering surveying (GB50026-2007). (China Planning Press, China, 2008).

Google Scholar

[3] Y.C. Lan F.K. LV and H.X. Ban. Dynamic Deformation Observation and Forecast. (China Agriculture Technology Press, China, 2007), p.53.

Google Scholar

[4] L.G. Tang. Research of Monitoring Land Subsidence by GPS Surveying in Tianjin. (MS., Tianjin University, China 2005), p.36.

Google Scholar