On Evaluation Methodology for the Performance of Engineering Project Management Based on 5-Element Set Pair Analysis

Article Preview

Abstract:

Being the main management model of government, engineering project management plays an important role in improving the benefit of investment and ensuring the quality of project, construction process and its safety. The evaluation system for performance of engineering project management (PM) is still new in the domain of engineering PM, in which it evaluates the management process and its service quality, and the management objectives are the contents of the evaluation system. Through analysis of the entire PM Service from these enterprises, the paper proposes an index evaluation system for the performance of engineering PM. Based on the 5-element set pair analysis whose philosophy is “admit objectively, describe systematically, cultivate qualitatively and analyze specifically”, it establishes an evaluation pattern for the entire process judgment and finally, combined with the actual cases, and it demonstrates the feasibility and applicability of the system.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2258-2262

Citation:

Online since:

November 2012

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] K.Q. Zhao: Journal of Anyang Institute of Technology, Vol.21 (2009) No.2,pp.107-108. (In Chinese)

Google Scholar

[2] Y.X. Du:Heilongjiang Science and Technology of Water Conservancy, Vol.12 (2011) No.6, pp.39-41. (In Chinese)

Google Scholar

[3] W.S. Wang, J.L. Jin and Y.Q. Li : Journal of Sichuan University(Engineering Science Edition), Vol.27 (2009) No.6, pp.6-12. (In Chinese)

Google Scholar

[4] G.P. Wang: Journal of Safety and Environment, Vol.11 (2006) No.6, pp.21-23. (In Chinese)

Google Scholar

[5] D.C. Huang and J.Q. Chen: Selection Computer Science, Vol.28 (2012) No.1, pp.210-214. (In Chinese)

Google Scholar