The Riverbed Evolution and its Influence on Channel in Tunaozi Reach after Three Gorges Water Storage

Article Preview

Abstract:

Tunaozi reach is one of the three famous sediment depositing reach on the Sichuan section of Yangtze River. It’s on the fluctuation backwater area when the Three Gorges Project is operated at the level of 135 m. According to the measured data before and after impoundment, this paper analyzes and calculates the sediment of the reach, and discusses the variation of silting and scouring of the reach after impoundment. Thus, this paper will have a study on the reason that silting and scouring lead to channel condition change. The result as follow: after impoundment, the bank-up water level of the reach has been head up 2 m during the flood season, sediment deposition becomes heavier than before impoundment; in post-flood season, the water level is 139m in November, it has been head up 7 m, compared with low water level in natural, current slowly flow further, the silt lack of enough scour in flood season, it leads to cumulative deposition. Until December 2005, thalweg plane position move left 200 m after impoundment. The maximum silting height of the thalweg longitudinal section is 30 m. The prime channel has been basically silted flat, year. Since the Three Gorges reservoir began to store water for three years, in low water level periods, ship tank is out of shallow, some timely dredging measure should be taken and make sure the smooth channel.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2323-2327

Citation:

Online since:

November 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] G.M. Jiang and Y. Wan: Planning of Wan'An Project, Yangtze River, (1996), pp.4-6.

Google Scholar

[2] C.K. Lin and X.Z. Gao: Evolutions of Rapids of Creek-bar at Gezhouba Reservoir and Their Impacts on Navigable Channel in the Changjiang River, (1995), P.119-126.

DOI: 10.18307/1995.0203

Google Scholar

[3] Q.S. Pan: The Yangtze River Water Conservancy Hub Project of Sediment Research. China Water Power Press, p.112.

Google Scholar

[4] Q.W. Han and M.M. He: Theory of Reservoir Channel Control, Scientific Research on 29 sets, Water Conservancy and hydropower court, Water conservancy and hydropower press, (1989)

Google Scholar

[5] X.Z. Li: The Way and Shipping Conditions of the Three Gorges Reservoir, China Water Transport, (2001), pp.31-33.

Google Scholar