p.2047
p.2052
p.2058
p.2064
p.2071
p.2076
p.2080
p.2086
p.2091
Design and Calculation of Double Buoys Mooring System in Estuary of Yalu River
Abstract:
In order to design a double buoys mooring system in the estuary of Yalu River for loading work of 40,000 tons of bulk cargo ship, the article mainly based on the practicality of the meteorological condition of this sea area and the data of the vessel as well as the national criterion, do some calculations of wind force, current force, wave force as well as the total force on the ship, with the calculation result to make a designation of double mooring buoy system, decide the size of the mooring buoy, the size and length of the chain, the size and the depth of the Deadman. The construction according to the designation has a good effect; the method of calculation and the designation are proved useful.
Info:
Periodical:
Pages:
2071-2075
Citation:
Online since:
December 2012
Authors:
Price:
Сopyright:
© 2013 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: