p.1429
p.1434
p.1439
p.1443
p.1447
p.1453
p.1458
p.1462
p.1466
Calculation and Analysis of the Construction Program in Nanjing Rail Transit Line 1 from South Yanande's Door to NingDan Road
Abstract:
It is the key to success or failure of the construction that we control the ground surface settlement, vault sink and supporting force by the choice of the reasonable construction method in the subway construction process. Based on the project profiles of the tunnel in Nanjing orbit traffic line 1 from South Yan'an road to NingDan road, the article mainly carries on the numerical simulation to construction program by using ANSYS finite element software according to the joint arch tunnel construction of the double and triple arch in the entry end .The article mainly has an analysis from the ground surface settlement, the strata, axial force of supporting structure, bending moment and other aspects. The results show that the program is feasible. The article provids guidance to the future construction of similar projects .
Info:
Periodical:
Pages:
1447-1452
Citation:
Online since:
December 2012
Authors:
Price:
Сopyright:
© 2013 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: