Research on Pile-Sinking System of Steel Pipe Pile in Full Size Model Process Test of HZM Bridge

Article Preview

Abstract:

The process of the pre-fabricated abutment and pier foundation construction by bed-burying method is adopted in The non-navigable arch bridge of HZM Bridge, According to the technology difficulties of sinking the pile accurately, A kind of tool type guide pile system with guideing and limitation function is put forward and designed, of which the structure and working method were introduced in this paper.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1591-1595

Citation:

Online since:

December 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Meng Fanchao. Design of HZM Bridge main body engineering[J],2010.6

Google Scholar

[2] Ministry of Construction P.R. China.JTJ041-2000 Technical Specifications for Construction of Highway Bridges and Culverts [S]. Beijing: China Planning Press

Google Scholar

[3] Ministry of Construction P.R. China.GB50017-2003 Code for Design of Steel structures [S]. Beijing: China Planning Press

Google Scholar