Research on Pile-Sinking System of Steel Pipe Pile in Full Size Model Process Test of HZM Bridge
Abstract:
The process of the pre-fabricated abutment and pier foundation construction by bed-burying method is adopted in The non-navigable arch bridge of HZM Bridge, According to the technology difficulties of sinking the pile accurately, A kind of tool type guide pile system with guideing and limitation function is put forward and designed, of which the structure and working method were introduced in this paper.
Info:
Periodical:
Pages:
1591-1595
Citation:
Online since:
December 2012