The Construction Technology of Segmented Parallel Operations in Main Shaft No. 2, Wutong Coal Mine

Article Preview

Abstract:

The construction of main shaft No.2 in Wutong coal mine is the key project of energy expansion and technological innovation. It started in December 2008 and jointed commissioning in the end of July 2010.Engineering capacity,a tight schedule and the difficulty of construction are the tough points. So if according with conventional construction methods,the project would have difficulty in completing on schedule.After repeated demonstration ,the researches of Wutong coal mine break the routine. The construction technology of segmented parallel operations is adopted to accelerate the construction schedule.This technology not only makes main shaft No.2 in advance of two months to complete construction and installation works, but also achieves difficult precisely through in both upper and lower segments.Totally plane error is only 80mm in through point.The project hits a good example for future wellbore rapid construction.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

163-169

Citation:

Online since:

December 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Hongsong Wei. Alley of Engineering [M]. Beijing: Coal industry publishes, 2007.

Google Scholar

[2] Dongming Guo, Renshu Yang, Kunlun Hu etc. Experimental Research on Long Hole Loose Blasting Mechanized Kaolin Mining [J]. Mining and Safety Engineering Journal, 2009, 26(4):428-432.

Google Scholar

[3] Qing Li. Experiment of Fracture Behaviors and Control for Crack Propagation under Blasting Load [D],China University of Mining and Technology(Beijing), Beijing:(2009)

Google Scholar

[4] Kunlun Hu, Renshu Yang, Xiaofeng Xu, Xinmin Ma. Blasting Test and Study on Driving of Deep-Seated Rock Tunnels of Coal Mines [J]. China Journal of Liaoning Technical University, 2007, 26(6):856-858

Google Scholar

[5] Renshu Yang, Zhiqiang Zhang, Qiang Sun. Research on Drilling and Blasting Yechnology for Deep Mine Hard Rock Roadway in Huainan Mining Area [J]. Coal Science and Technology, 2005, 33(2):42-45

Google Scholar

[6] Erxin Gao, Renshu Yang. Blasting Engineering [M]. Xuzhou: University of Mining and Technology (Beijing), 1999.

Google Scholar

[7] Dong Xucheng. Reasonable roof supporting method is to accelerate the ensemble dug coal rock face of half the progress key [J]. Heilongjiang science and technology information, 2011(9): 65-66.

Google Scholar

[8] Changwei Xin. Half Coal Crag Lane Formation Engineering Research and Discusses [J]. Shandong Coal Technology, 2008(6): 113-114.

Google Scholar