Researching the GERTS Schedule Simulation Model Based on Resource Constraints

Article Preview

Abstract:

To solve the problem of resources constraints to the process in the schedule plan, this paper presents a GERTS schedule simulation model with resource constraints. Through the change of the GERTS model nodes, which introduces and re-defines a resource function, it solves the GERTS’s defects in describing an action that depends too much on the resource. The model is applicable to the simulation and analysis of the schedule plan. Finally, the paper gives the example of the specific simulation algorithm.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

3049-3053

Citation:

Online since:

December 2012

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Baohua YANG, Chinese Journal of management, vol. 8, No. 12, 2011. 12. 1879-1883. in Chinese.

Google Scholar

[2] Zhigeng FANG, Chinese Journal of management Science, vol. 17, No. 12, 2009. 04. 102-107. in Chinese.

Google Scholar

[3] Xiangang Xiao, Logistics Sci-Tech, No. 4, 2009. 25-28. in Chinese.

Google Scholar

[4] Jianqiang ZHANG, Journal of System Simulation, vol. 16, No. 8, 2004. 08. 1641-1644. in Chinese.

Google Scholar

[5] Kun Deng, Journal of Computer Simulation, vol. 24, No. 12, 2007. 12. 32-36. in Chinese.

Google Scholar

[6] Tao ZHANG, System Engineering-Theory Methodology Applications, vol. 13, No. 5, 2004. 10. 404-408. in Chinese.

Google Scholar