[1]
Arbabi, Mansur, J.A. Garate. Interactive Real Time Scheduling and Control. in Proceedings of the 1985 Summer Simulation Conference. 1985.
Google Scholar
[2]
T.D. Gooley. Automating the Satellite Range Scheduling Process. 1993, Air Force Institute of Technology.
Google Scholar
[3]
S.M. Schalck. Automating Satellite Range Scheduling. 1993, Air Force Institute of Technology.
Google Scholar
[4]
D.A. Parish. A Genetic Algorithm Approach to Automating Satellite Range Scheduling. 1994, Air Force Institute of Technology.
Google Scholar
[5]
Jang. K. The Capacity of The Air Force Satellite Control Network. 1996, Air Force Institute of Technology.
Google Scholar
[6]
Barbulescu. L, A. Howe, D. Whitley. Leap Before You Look: An Effective Strategy in an Oversubscribed Scheduling Problem in the 21st National Conference on Artificial Intelligence. 2004.
Google Scholar
[7]
Barbulescu. L, et al. Satellite Range Scheduling: A Comparison of Genetic, Heuristic and Local Search, in Seventh International Conference on Parallel Problem-Solving From Nature. 2002.
DOI: 10.1007/3-540-45712-7_59
Google Scholar
[8]
Barbulescu. L, et al., Scheduling Space-Ground Communications for the Air Force Satellite Control Network. Journal of Scheduling, 2004.01. 7.
DOI: 10.1023/b:josh.0000013053.32600.3c
Google Scholar
[9]
Bradley J. Clement, M.D.J. The Deep Space Network Scheduling Problem. in IAAI,2005 American Association for Artificial Intelligence. 2005. Pittsburgh, PA: AAAI Press.
Google Scholar
[10]
Bradley J. Clement, M.D.J. Design of a Deep Space Network Scheduling Application. in AAAI(2006). 2006.
Google Scholar
[11]
F.Marinelli, et al. A Lagrangian Heuristic for Satellite Range Scheduling with Resource Constraints.
Google Scholar
[12]
JIN Guang,WU Xiao-yue,GAO Wei-bin.Ground Station Resource Scheduling Optimization Model and its Heuristic Algorithm[J].System Engineering and Electronics. 2004, 26(12): 1839-1841, 1875(in Chinese).
Google Scholar
[13]
LI Yuan-xin,WU Bin.GA-based Optimal Allocation of Station Resource[J].Journal of Spacecraft TT&C Technology,2005,24(4):1-5(in Chinese).
Google Scholar
[14]
WANG Yuan-zhen,ZHAO Jian,NIE Cheng. Study on Petri Net Model for Multi-Satellite-Ground Station System[J].Journal of Air Force Engineering University(Natural Science Edition),2003,4:7-11(in Chinese).
Google Scholar
[15]
JIN Guang, WU Xiao-Yue, GAO Wei-bin. Conflict Based Resource Scheduling and Capability Analysis of Satellite-ground Station System[J]. Journal of Chinese Computer Systems, 2007. 28(2):310-312(in Chinese).
Google Scholar