Research on Design and Development for Integrated Production Planning and Scheduling System of Rare Metal Manufacturing Based on WEB Platform

Article Preview

Abstract:

Aiming at the design and development of integrated production planning and scheduling system(PPSS) of rare metal manufacturing, the goals and main functions of the integrated production planning and scheduling system were analyzed and designed based on the analysis of rare metal manufacturing enterprise’s main characteristics and management status. Through analysis of the present situation and trend of production planning and scheduling, an integrated system architecture was proposed. Key technologies of system integration and system developing were delivered, and some key functions of production planning and scheduling system which include annual plans management, monthly plans management, MRP management, production scheduling management and production Kanban management were developed based on JSP technology and WEB platform. The practical applications in some rare metal manufacturing enterprises were proved that the integrated production planning and scheduling system could enhance the manufacturing management level effectively.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1490-1494

Citation:

Online since:

December 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Yuwei An and Hongsen Yan, Integrated optimization for production planning and scheduling in a two-stage production system[J], Computer Integrated Manufacturing Systems,2012,18(4), pp.796-806(Ch).

Google Scholar

[2] Shaoqiang Wang and Zhongyi Mei, Research on collaborative production planning and schedul-ing system in the aircraft enterprise[J], Modern Manufacturing Engineering,2012,(4), pp.25-29(Ch).

Google Scholar

[3] Zhou Q,Ristic M and Besant C B,An information management architecture for production plan-ing in a virtual enterprise, International Journal of Production Research[J],Vol.16 (2000).

Google Scholar

[4] Latifa Ouzizi,Didier Anciaux and Marie Claude Portmann et al,A model for cooperative planning within a virtual enterprise[J],International Journal of Computer Integrated Manufactur-ing Vol.19 (2006).

DOI: 10.1080/03081070500066070

Google Scholar

[5] Hongliang Wang and Xiaobing Liu,Multi-layer integrated dynamic production scheduling system [J], Computer Integrated Manufacturing Systems,2011,17(6), pp.1240-1246(Ch).

Google Scholar

[6] Bingzhi Gao,Di Wu,Xiaojuan Ban and Huiyuan Qin, Steel Enterprise Production Scheduling and its Application[J], Computer Engineering &science,2011,33(9), pp.157-162(Ch).

Google Scholar

[7] Liping Nie,Weiyong Zhang and Jinsong Xu, Research on integrating of distributed heterogeneo-us database systems and its application[J], Journal of Hefei University of Technology(Natural Science),2006,29(3),pp.309-312(Ch).

Google Scholar

[8] Shaohua Hao and Han Xie, Heterogeneous relational database integration model based on XML [J], Computer Engineering and Design,2010,31(24),pp.5285-5288(Ch).

Google Scholar

[9] Wei Qiang, JSP technology introduction and development prospects[J], Equipment Manufacturing Technology,2010,30(2),pp.68-70(Ch).

Google Scholar