Finite Element Analysis about Temporary Bracing of Prefabricated Column of Prefabricated Structure

Article Preview

Abstract:

Based on the features of lifting construction of prefabricated structure, propose a new type of temporary bracing of prefabricated column, and analyze the two different structural forms of the traditional prefabricated column bracing frame and the new prefabricated column bracing frame by finite element software ANSYS. The results show that the new precast column support frame have a better stability and stronger lodging resistance

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1180-1183

Citation:

Online since:

January 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] GB 50017-2003.Code for Design of Steel Structures[S]. Beijing: CHINA ARCHITECTURE & BUILDING PRESS, (2003)

Google Scholar

[2] GB 50205-2001.Code for Acceptance of Construction Quality of Steel Structures[S]. Beijing: CHINA ARCHITECTURE & BUILDING PRESS, (2001)

Google Scholar

[3] ZHANG Haiyan, SHEN Qiyu, HUANG Yulong. Construction Technology of A New Precast Concrete Structure System in Hong Kong [J]. ARCHITECTURE TECHNOLOGY, 2009, 40(8)

Google Scholar

[4] Zhou Nin. Precast Concrete Components Applied to Extra Tall Building in Hong Kong [J].BUILDING CONSTRUCTION, Vol.27 No.7

Google Scholar

[5] Huang Hao. Experimental Study On Semi-Rigid Joint and Basic Load-Bearing Element In Plug-pin Steel-Tube Scaffold [D]. Chongqing University April, (2006)

Google Scholar

[6] Fang Yu. A Study of Security of Plug-pin Steel-Tube Scaffold [D]. Chongqing University, May 2006.

Google Scholar

[7] Ji Fang. PC Structure Applied to "Beijing Vanke Wan Huang Homestead" Project [J]. BUILDING CONSTRUCTION, 2009, Vol31 No.11

Google Scholar