Study of the Construction Plan Bid Assessment Method of the Coal Mine Project Based on Entropy-Weight Method

Article Preview

Abstract:

In order to choose the optimal construction scheme in the coal mine construction project, this paper establishes evaluation indexes and applies entropy weight method to determine the objective weight of evaluation index based on the expert scoring so that the evaluation results are more consistent with the actual situation. This method solves the drawbacks that the evaluation indexes depend on the subjective assumptions too much and provide an effective method for choosing the optimal bid scheme of the coal mine construction.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2748-2751

Citation:

Online since:

January 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Ming Yi. Study on Scheduling Optimizing of Multi-project under The Priority [D]. China Master's Theses Full-text Database, 2008(in Chinese).

Google Scholar

[2] Y. Wang, S.R. Wu and Z.H. Wang. Study of The Comparison and Selection Method of The Mining Project Investment Based on Entropy-weight Method[J]. Applied Mechanics and Materials Vols. 94-96, (2011).

DOI: 10.4028/www.scientific.net/amm.94-96.1752

Google Scholar

[3] Kai Guo, Haifeng Liu. The Application of Entropy Weight in The Bid of The Coal Mine Construction Project. China Mining Magazine, (2004), Vol·19, No·4: 97-99 (in Chinese).

Google Scholar

[4] Haibo Fu, Rui Kong. Comparative Evaluation On Mineral Resources Competitiveness Based On Entropy Weight Method [J]. Resources& Industries. (2010), Vol·12 No·3: 66-70(in Chinese).

Google Scholar