Application of Synchronizing Procedure with Multistage Variants of how an Assembly Operation Process in the Design Layout of the More Assembly Lines Workplace

Article Preview

Abstract:

This paper deals with the knowledge of the author of the application procedure for synchronizing with multistage operations variants of how an assembly processes in the design layout of the workplace of more assembly lines and its verifying the selected applications. This is a new balancing method, which allows for the set as follows to minimize the number of workplaces more of that line. Operations synchronizing on the assembly process over the line in a question is performed by exchanging variant ways of making assembly operations, technological advances over the present line of products according to their coefficient of efficiency. Switching of variations on how an operation is achieved minimizing the total idle time line of more in question line and at the same time increasing of product added value flow of before stated arbor line in question. Algorithm of synchronizing operations assembly processes of more lines in question takes place in two stages. Use them to reach new designs layout of workplaces over the routes with fewer offices than in the first stage, but with a lower total cost (purchase and production) and these are also evaluated by the coefficient of efficiency over the present line. The highest increase in the value of the flow of value-added variant achieves the highest value of the coefficient of efficiency over the present line. The aim of synchronizing the application of the proposed action is to increase the flow of value added products in question more assembly lines and flexible response to customer needs.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

195-205

Citation:

Online since:

February 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Dohnal G., Modely montážních linek, REQUEST'06, Sborník příspěvků 1. konference Centra pro jakost a spolehlivost výroby Praha, 30. 1. – 1. 2. 2007, ISBN 978-80-01-03709-6, p.76 – 85, ( 2007).

Google Scholar

[2] Wester L, Kilbridge M. D., The assembly line model mix seguenling problem, Proceedings of the Third . International Conference on Operations Research, Oslo, p.247 – 260, (1936).

Google Scholar

[3] Thomopoulos N. T., Line balancing – sequencing for mixed model assembly, Management Science, 14, č. 2, p.59 – 75, (1967).

DOI: 10.1287/mnsc.14.2.b59

Google Scholar

[4] Thomopoulos N. T., a Sequencieng procedure for a multi model assembly line, Ph. O. Dissertation, Illnois Institute of Technology, Chicago, (1966).

Google Scholar

[5] Kilbridge M. D., Kilbridge M. D., A heuristic method of assembly line balancing, Journal of Industrial Engineering, 12, N. 4, p.231 – 307, (1961).

Google Scholar

[6] Arcus A. L., Comsoal A Computer method of sequencing oerations form assembly lines, The Inetrnational of production Research, 4, N. 4, p.272 – 273, (1966).

Google Scholar

[7] Arcus A. L., An analysis of a computer method of sequencing assembly line oerations, Ph. O. Dissertation, University of california, Becheley, (1963).

Google Scholar

[8] Görke M., Rechnerunterschtüztes Verfahren zur Leistungsabstimmung vo Mehrmodell Montage Systemen Krausskopf, verlag, GmbH, Mainz, (1978).

Google Scholar

[9] Rolínek K.,  Trhlík J., Algoritmus projektovaní montážních linek s optimálním stupněm mechanizace, výskumná správa VS – 718, Nové Mesto nad Váhom, VUMA, (1974).

Google Scholar

[10] Xiaowei Zhu S. Jack Hu Yoram Koren, Samuel P. Marin, Modeling of Manufacturing Complexity in Mixed-Model Assembly Lines, Journal of Manufacturing Science and Engineering, OCTOBER 2008, Vol. 130 / 051013-9, (2008).

DOI: 10.1115/1.2953076

Google Scholar

[11] Gregor, M., Matuszek, J., Organizácia materiálových tokov v podniku, In Produktivita a Inovácie 4/2005, ISSN 1335-5961, (2005).

Google Scholar

[12] Cibulka V., Vyvažovanie viacpredmetných montážnych liniek, kandidátska dizertačná práca, Slovenská vysoká škola technická, strojnícka fakulta, katedra organizácie a riadenia strojárskej a elektrotechnickej výroby, Bratislava, 157 p., (1982).

Google Scholar

[13] Cibulka V., Celostné riadenie kontinuity procesov pomocou dynamickej simulácie, 13. medzinárodná vedecká konferencia, TRANSFER 2012, Trenčín, 17. – 18. október 2012, [7 p. ], (2012 ).

Google Scholar

[14] Cibulka V., Complex Approach to Goods Quality Improvement for the Company and the Customer, Köthen: Hochschule Anhalt, 103 s., ISBN 978-3- 86011-035-5, (2010).

Google Scholar

[15] Cibulka V., Zlepšovanie návrhov plánov kvality projektov metódou dynamickej simulácie, In: Transfer 2011, 12. medzinárodná vedecká konferencia, Trenčí, ISBN 978-80-8075-505-8, [7 p. ], (2011).

Google Scholar

[16] Cibulka V., Návrh postupu aplikovania manažérstva trvalého úspechu v priemyselnej organizácii z hľadiska manažérstva procesov, In: Environmentální účetnictví a reporting na mikroekonomické a makroekonomické úrovni, Sborník z mezinárodní vědecké konference, Brno : Masarykova univerzita, p.13 – 21, (2012).

DOI: 10.33543/mmk.2019.10

Google Scholar