Prediction Model of Passenger Waiting Time in High-Speed Rail Hub Based on Bp Neural Network

Article Preview

Abstract:

In order to explore the characteristics of passenger waiting time in high-speed rail hub, this paper analyzed the influencing factors of passenger waiting time, based on the survey of passenger waiting time in high-speed rail hub. And the main influencing factors were screened out using variance analysis. Then the prediction model of passenger waiting time based on BP neural network was established, the parameters of the model were calibrated and the validity was verified. The results show that, travel time in urban area, trip distance, familiarity toward the hub, educational background of passengers, and the type of transportation is the main influencing factor of passenger waiting time in high-speed rail hub, and the average relative error is only 9.2% using the proposed prediction model of passenger waiting time based on BP neural network.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1903-1906

Citation:

Online since:

June 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Wardman M. A review of British evidence on time and service quality valuations[J]. Transportation Research Part E, 2001, 37 (2-3): 107-128.

DOI: 10.1016/s1366-5545(00)00012-0

Google Scholar

[2] Muller C, Gosling G.D. A framework for evaluating level of service for airport terminals[J]. Transportation

Google Scholar

[3] Welding P.I. The instability of a close-interval service. Operational Research Quarterly[J], 1957, 8(3): 133-142.

Google Scholar

[4] Osuna E.E, Newell G.F. Central strategies for an idealized public transport system[J]. Transportation Science, 1972, 6(1): 52-72.

DOI: 10.1287/trsc.6.1.52

Google Scholar

[5] Tumquist, M.A. Strategies for improving reliability of bus transit service[J]. Transportation Research Record, 1981, 818, 7-13.

Google Scholar

[6] Seddon P A, Day M P. Bus passenger waiting time in great manchester[J], Traffic Engineering and Control, 1974, 15(9): 422-445.

Google Scholar

[7] Chien S.I.-J, Optimization of headway, vehicle size and route choice for minimum cost feeder service[J]. Transportation Planning and Technology, 2005, 28(5): 359-380.

DOI: 10.1080/03081060500322565

Google Scholar