Research on Path Selected Method in MultiTask-Point Road Networks Based BPR Function

Article Preview

Abstract:

It is very difficult for commander to select an optimized march path when multi-team marched to given-task-point in a complex road network. The modified BPR function including road service parameter and teams amount is built, an optimize path selecting method is put forward, All teams runtime are contrasted between centralized march and self-determination march, results showed that commander’s dispatching ability is very important for completing the march task.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1616-1620

Citation:

Online since:

July 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] XUE geli, WANG Jian Ping. a VPR solution for supply route based on ant arithmetic[J]. Computer system application. 2012, 21(2): 200-203.

Google Scholar

[2] ZHENG yuan, SUN li jun. discuss of BPR function[J]. traffic and transport,2007,24(7): 107-110.

Google Scholar

[3] Wang Suxin, Wang Leizhen. Improvement Study on BPR Link Performance Function[J]. Journal of Wuhan University of Technology. ( Transportation Science & Engineering ), Vol. 33 ( 3). 2009: 446-449.

Google Scholar

[4] Xu Meng, Shi Zhong ke. Outflow models based on velocity/ density formulation used in dynamic traffic assignment [C], Proceedings of 2005 International Conference on Machine Learning and Cybernetics, Guangzhou, 2005: 3568- 3573.

DOI: 10.1109/icmlc.2005.1527560

Google Scholar

[5] DAI J ifeng , ZHAO Yanfeng , ZHANG Guohua. Calibration and Validation of Vehicular Impedance Functions[J], Urban Transport of China, Vol. 5( 1). 2007: 41-45.

Google Scholar