The Experimental Study on Steel Crane-Girder before and after Reinforcement

Article Preview

Abstract:

This article focuses on a cracking steel crane girder of one factory, on the basis of extensive investigation and research on the fatigue damage of cracking steel crane girder at home and abroad. Sectional stress is redistribution and the stress concentration phenomenon of the crack tip has been alleviated. After reinforcement, the local stiffness of the upper flange and web greatly increases, The results show that it can extend the fatigue remaining service life of fatigue cracking of the steel crane girder by increasing the effective cross section area and stiffness, and it is a good guide on reinforcement and maintenance of actual industrial plant cracking steel crane girder.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1364-1367

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] SunZhixiong, etc. Weldingof fracture mechanics [M]. Xi'an: Northwest University Press, (1990).

Google Scholar

[2] Harold S R, David A D, Fatigue cracking in welded crane runway girders: causes and repair procedures [J]. Iron and Steel Engineer, 1978, 237(5): 91-94.

Google Scholar

[3] Li Bin, Tian Zhichang, Sun Zhen. Steel crane girder reinforcement test. Industrial buildings, 2000, 30 (12).

Google Scholar

[4] Gao Wenzhu, Wu Huan, Zhao Yongqing, etc. Metal Fatigue Crack Propagation Studies [J]. The progress of the titanium industry, 2007, 24 (6) : 33-37.

Google Scholar

[5] Xia Xiaodong. Gao Ri. Feng Xiaoxia. Steel truss bridge with a crack component testing and evaluation. Steel structures. 2007, (4): 81 ~ 83.

Google Scholar