Mechanical Mechanism of the Post-Grouting Pile
Abstract:
The bored piles are widely used in engineering, but also a lack of understanding of the mechanical mechanism of post-grouting technology, design and calculations based on the experience. Using FLAC3D finite element software, analyzing from axial force, pile lateral friction, pile end resistance to improve the carrying performance. Simulation data and field test QS curves is almost consistent, verifying that the model is correct. Contrasting between the not-grouting pile and grouting pile, finding that the limit lateral friction and end resistance of grouting pile have significantly increased in the maximum loads.